Search
Search text
Results 171-180 of 406
Liebherr heavy lift offshore crane starts operation in Global Tech I
Liebherr heavy lift offshore crane starts operation in Global Tech I In early March Liebherr’s new heavy lift offshore crane CAL 45000-1200 Litronic® successfully started with the installation of AREVA
Liebherr has won an order to deliver a heavy lift crane
semi-submersible offshore windfarm foundation installation vessel.
Wind power learns to swim: France’s first floating offshore wind farm
Wind power learns to swim: France’s first floating offshore wind farm The latest story in the Group Magazine shows how the first floating offshore wind farm in France was built off the coast of Marseille
https://www.liebherr.com/en-int/n/wind-power-is-learning-to-swim-105728-3935641
Liebherr at the OTC 2015 in Houston, USA
for the offshore crane model series Liebherr will once again be presenting its competencies as a global market leader in the offshore crane segment at the Offshore Technology Conference (OTC) at stand
https://www.liebherr.com/en-int/n/liebherr-at-the-otc-2015-in-houston-usa-19844-3935641
Lindø port of Odense gets prepared for the challenges of tomorrow
The LHM 800 will enable the Lindø port of Odense to cope with the huge offshore wind turbines of tomorrow.
FPSO with two new Liebherr offshore cranes
The Board Offshore Cranes are destined for an FPSO unit operating off the coast of Newfoundland. The BOS crane series is one of the latest series of Liebherr offshore cranes.
https://www.liebherr.com/en-int/n/fpso-with-two-new-liebherr-offshore-cranes-98240-3935641
Lindø port of Odense gets prepared for the challenges of tomorrow
The port is located strategically between the North Sea and the Baltic Sea and offers world class facilities to the offshore wind industry.
Liebherr Maritime Cranes Newsletter Issue 1/2022
Liebherr Intelligent Maintenance (LiMain) paves the way for an even higher crane availability at lower operational costs (OPEX) on offshore platforms.
ONE-Dyas chooses LiMain remote maintenance
After delivery and assembly, the platform operator can subsequently monitor and maintain the entire offshore crane fleet from the office.
https://www.liebherr.com/en-int/n/one-dyas-chooses-limain-remote-maintenance-27290-3935641







