Search
Search text
Results 1421-1430 of 3,432
A world first in Great Britain: delivery of Liebherr’s first hydraulic excavator with a factory-fitted Leica Geosystems machine control system
The generation 8 R 934 crawler excavator comes with the Leica 3D passive system and will be soon updatedd with a semi-automatic system featuring an automatic inclination/rotation function.
Crawler Dozers
The new Generation 8 Crawler Dozers are the perfect answer to the daily demands of the construction site.
Maritime Cranes Newsletter Issue 2/2023 | Liebherr
The onboard electricity will be generated by newly installed Stage V gensets, conforming to the latest emission standards in the business. Special offer!
https://www.liebherr.com/en-int/maritime-cranes/news/newsletter/issue-2-2023-6409499
Training | Liebherr deep foundation
For general enquiries please contact our support team: Do you work together with external partners?
https://www.liebherr.com/en-int/deep-foundation/services/training-5389691
Full speed ahead across the world’s oceans
The environmental advantage of LNG is clear: using gas as a maritime fuel reduces nitrogen oxides by up to 85 per cent and generates 20 per cent less CO₂ than marine diesel.
A 918 Compact Litronic - Generation 8 compact wheeled excavator
The A 918 Compact marks the beginning - further Generation 8 machines will follow, heralding the next level of efficiency, ease of use and performance.
Pure gold
Electronics is the greatest masterpiece for the new generation of cranes.
Liebherr Quarry Days attract over 1,000 visitors from all over the world
XPower® represents the new generation of large Liebherr wheel loaders.
5 key takeaways from MINExpo 2024
of dozing: the PR 776 G8 MINExpo 2024 also saw the world premiere of the PR 776 G8 – the latest generation of our flagship 70-tonne mining dozer.
https://www.liebherr.com/en-int/n/five-key-takeaways-from-minexpo-2024-100032-3935641
Grand Paris: Delivery of the tenth Liebherr 1000 EC-H 40 High-Top crane within two years
These elements generally weigh between 7 and 8 tonnes and are assembled to form a ring, which normally consists of 7 parts. The lining segments are delivered on site by truck.



