Deep foundation

The LRB 19 is designed for all common applications in specialised civil engineering, such as piling and vibrating applications as well as drilling with Kelly equipment, double drill head, full displacement tool or soil mixing. The attachments can be easily changed using the hydraulic quick-change system without the driver having to leave the cab. All hydraulic, mechanical and electrical connections are automatically coupled. Improved hose routing optimises the work process. The name LRB 19 refers to the maximum travel distance of the carriage of 19 metres. A 450 kW motor provides the necessary...

  • Operating weight - 53.0 t

  • Operating weight - 48.2 - 50.7 t

  • Max. torque - 180 kNm

  • Max. crowd force - 250 kN

  • Engine power - 450 kW

  • Pile driving with vibrator slim design, max. pile length - 18.0 m