Material handling

Duty cycle crawler cranes

The all-rounder

Versatility is the key.

Job report port dredging

Our duty cycle crawler crane HS 8300 HD in dredging application in Piombino to remove deposited sediment from the mouth of the port and also to increase the depth of the water.

Job Report

Dredging of sediments on a high altitude reservoir in the Swiss Alps: Due to the large grab capacity of 10 m³, the duty cycle crawler crane achieves an average hourly handling performance of 130 m³.

Multitalent for material handling

Fitted with a wide range of different equipment, duty cycle crawler cranes of the HS series are used for typical material handling tasks with dragline excavator as well as various mechanical or hydraulic grabs. Even in dredging operations on pontoons, duty cycle crawler cranes have established themselves successfully.
01/04
Skip filter

Results 1-7 of 7

  • Max. lifting capacity - 40 t

  • Engine power - 230 kW

  • Max. winch line pull - 2 x 120 kN

  • Max. main boom - 41.00 m

Availability - See countries

  • Max. lifting capacity - 70 t

  • Engine power - 320 kW

  • Max. winch line pull - 2 x 200 kN

  • Max. main boom - 50.00 m

Availability - See countries

  • Max. lifting capacity - 100 t

  • Engine power - 450 kW

  • Max. winch line pull - 2 x 295 kN

  • Max. main boom - 59.00 m

Availability - See countries

  • Max. lifting capacity - 100 t

  • Engine power - 450 kW

  • Max. winch line pull - 2 x 295 kN

  • Max. main boom - 59.00 m

Availability - See countries

  • Max. lifting capacity - 130 t

  • Engine power - 565 kW

  • Max. winch line pull - 2 x 350 kN

  • Max. main boom - 53.00 m

Availability - See countries

  • Max. lifting capacity - 200 t

  • Engine power - 750 kW

  • Max. winch line pull - 2 x 350 kN

  • Max. main boom - 68.00 m

Availability - See countries

  • Max. lifting capacity - 300 t

  • Engine power - 750 kW

  • Max. winch line pull - 2 x 500 kN

  • Max. main boom - 68.00 m

Availability - See countries