Group

News and press releases

Start search
Results 1657-1674 of 4.016
  • Travelling up to the treeline with snow chains

    09/11/2021

    Press releases

    Travelling up to the treeline with snow chains

    In Austria, work is currently proceeding at full speed on the "Salzburg line", the country's most important electricity infrastructure project. The Salzburg line runs for a total length of 128 kilometres through the province of Salzburg in partly alpine terrain. The Liebherr mobile cranes working on the construction of the massive electricity pylons have had to access sites at altitudes of up to 1800 metres above sea level.

  • The new weightlifter: LR 1400 SX

    09/11/2021

    Press releases

    The new weightlifter: LR 1400 SX

    “This is a big step for our location,” says Gerhard Frainer, Managing Director for Sales. “The request for a larger crane came from the market.” With the new LR 1400 SX, Liebherr-Werk Nenzing Gmbh extends its range of crawler cranes to include lifting capacities of up to 400 t. Especially satisfying: the first customers are already using the new model.

  • Mazeau Recyclage welcomes a new Liebherr LH 80 M High Rise materials handler

    05/11/2021

    Press releases

    Mazeau Recyclage welcomes a new Liebherr LH 80 M High Rise materials handler

    Mazeau Recyclage was looking for a new materials handler to improve the site’s productivity and reduce boat loading times. This one is an addition to the existing Liebherr A 944 C HD High Rise Litronic handling machine. The LH 80 M High Rise is being used in the Paris region for materials handling tasks at Mazeau Recyclage’s Gennevilliers centre.

  • Liebherr tower cranes get new touch display with smart operating system

    04/11/2021

    Press releases

    Liebherr tower cranes get new touch display with smart operating system

    It’s essential for crane operators to have key operating settings in view at all times to ensure safe and precise lifting – and these need to be presented with clarity. Along with its intuitive TC-OS user interface, the new-generation EMS-4 brings together these two requirements in a twelve-inch display. Crane operators and assembly engineers will now be able to navigate their way through a menu structure geared to their needs via multi-touch technology

  • Liebherr blade bearings for tomorrow’s service operations

    03/11/2021

    News

    Liebherr blade bearings for tomorrow’s service operations

    Liebherr opens up new possibilities for wind turbine operators and service providers with optimised blade bearings in 3-row roller bearing design. Thanks to said bearings, the service life of wind turbines is extended even under high loads.

  • Three Liebherr L 586 XPower® wheel loaders for BTB Group Berlin

    03/11/2021

    News

    Three Liebherr L 586 XPower® wheel loaders for BTB Group Berlin

    Three new L 586 XPower® units have recently been put into operation at BTB Group Berlin's 25-hectare recycling facility.

  • Profitability as a unique selling point: Three Liebherr L 586 XPower® wheel loaders for BTB Group Berlin

    03/11/2021

    Press releases

    Profitability as a unique selling point: Three Liebherr L 586 XPower® wheel loaders for BTB Group Berlin

    Building for Berlin since 1990 – the family-run BTB Group Berlin offers everything from earthmoving to recycling from a single supplier. Three new Liebherr L 586 XPower® wheel loaders have recently been added to the company's fleet. They replace L 580 XPower® machines purchased in 2017, which have performed reliably. Their fuel efficiency, compared to other wheel loaders of the same size, was an important criterion in the purchasing decision. The new wheel loaders are also visually-impressive with their special paintwork in the BTB Group corporate design. The keys were handed over in person by Oliver Hanneck, salesman at Liebherr-Baumaschinen Vertriebs- und Service GmbH Berlin.

  • Rounding off the portfolio – Seeland decides to purchase the Liebherr LTM 1150-5.3

    03/11/2021

    Press releases

    Rounding off the portfolio – Seeland decides to purchase the Liebherr LTM 1150-5.3

    Gustav Seeland GmbH has purchased a 150 tonne mobile crane to meet high demand. A Liebherr LTM 1150-5.3 has now rounded off the Hamburg-based crane and heavy haulage contractor’s portfolio. The very latest crane technology and long term partnership were key factors in choosing Liebherr once again.

  • Mobile harbour cranes with electric drive in high demand

    03/11/2021

    Press releases

    Mobile harbour cranes with electric drive in high demand

    In the 2021 sales year, demand for Liebherr mobile harbour cranes with an e-drive has risen sharply. Compared to 2019, the number of units equipped with an electric motor has even doubled. Liebherr has been successfully using a hybrid drive concept consisting of a diesel engine and an electric drive for the mobile harbour cranes product segment for over 20 years. In addition to emission-free handling, the benefits of e-drive include cost savings and less maintenance.

  • Liebherr’s H2 direct injection solutions for heavy-duty engines

    02/11/2021

    Press releases

    Liebherr’s H2 direct injection solutions for heavy-duty engines

    The mobility industry is currently focusing heavily on reducing CO2 emissions. For on-highway vehicles, from passenger cars all the way to heavy trucks, clear objectives have already been defined internationally. For off-highway applications, on the other hand, no binding plans have yet been set forth. However, the global decarbonisation strategy is showing increased interest in hydrogen as a fuel among OEMs and engine manufacturers in the on- and off-highway sectors. As a development partner and system supplier for climate-friendly injection technology, Liebherr offers solutions for hydrogen combustion engines that can be used in on- and off-highway applications.

  • Liebherr-France SAS: Christophe Sanchez replaces Martin Schickel as Director General

    02/11/2021

    Press releases

    Liebherr-France SAS: Christophe Sanchez replaces Martin Schickel as Director General

    It is the end of an era, both for the general management of Liebherr-France SAS and for the entire Liebherr Group. Martin Schickel is retiring after more than 44 years with the company. He is handing over the reins to the person who already replaced him as General Director of Liebherr-Location-France SAS in June 2020: Christophe Sanchez.

  • The end of an era – the last LR 1600/2 leaves the Liebherr Plant in Ehingen

    29/10/2021

    Press releases

    The end of an era – the last LR 1600/2 leaves the Liebherr Plant in Ehingen

    The end of an era after 220 models built – production of one of Liebherr’s most successful crawler cranes is being discontinued. The last LR 1600/2, which was primarily designed and used for wind power jobs, will be delivered at the end of October. Its successor is the LR 1700-1.0, which Liebherr launched in June 2021 and which has already become very popular all over the world as the new standard in the crawler crane segment for wind power.

  • An interaction that rules

    28/10/2021

    Press releases

    An interaction that rules

    When the right parts work together, the result is success. What sounds like a familiar promise at first, however, applies perfectly to the Liebherr product division of drive technology and slewing bearings. The components of both product areas come directly from Liebherr site in Biberach (Germany). In customer applications, this interaction results in advantages that extend well beyond the respective individual product strengths.

  • Jubilee: Excavator marking 60 years of Liebherr in France handed over to the Chavaz Père et Fils company

    28/10/2021

    Press releases

    Jubilee: Excavator marking 60 years of Liebherr in France handed over to the Chavaz Père et Fils company

    An R 960 SME designed in a 1960s “vintage” style was handed over to Chavaz, a customer specialising in quarrying. This special model, produced at Liebherr’s historic site in France, celebrates the brand’s 60 years in the country.

  • Liebherr ends first half of the year with positive result

    27/10/2021

    Press releases

    Liebherr ends first half of the year with positive result

    Following a sharp increase in turnover, incoming orders at the highest level and increasing investments, the Liebherr Group reports a positive performance for the first half of 2021. The company expects that this trend will continue throughout the current year.

  • Unique – Dźwig-Mar takes delivery of the first LTM 1650-8.1 in Poland

    27/10/2021

    Press releases

    Unique – Dźwig-Mar takes delivery of the first LTM 1650-8.1 in Poland

    “The LTM 1650-8.1 has a unique design and concept. It is variable and powerful, yet compact”, says Marcin Zielonka, Managing Director at Dźwig-Mar s.c. The Polish crane and heavy haulage contractor took delivery of the first LTM 1650-8.1 mobile crane from Liebherr in Poland. The new crane will upgrade the company’s fleet which consists of over thirty Liebherr cranes.

  • Liebherr reaches a new milestone in tunnelling

    25/10/2021

    Press releases

    Liebherr reaches a new milestone in tunnelling

    With its main bearing for Shanghai Tunnel Engineering (STEC), a Chinese system provider of tunnel boring machines (TBMs), Liebherr has reached the next dimension in tunnel construction. With the diameter of almost eight metres and the weight of 44 tons, the roller bearing is a real heavyweight to be used in one of the largest tunnel boring machines. At the same time, the bearing is the largest TBM main bearing of its kind produced by Liebherr to date.

  • Liebherr spare parts for overhaul of CTA’s 5000-series level control systems

    22/10/2021

    Press releases

    Liebherr spare parts for overhaul of CTA’s 5000-series level control systems

    Liebherr-Transportation Systems will deliver spare parts for the overhaul of the Chicago Transit Authority’s (CTA) electro-hydraulic level control systems, which were developed and manufactured by Liebherr for the 5000-series rail vehicles. Delivery has already started this year and will be completed by the beginning of 2025. The system overhauls will be carried out in the workshops of the CTA Rail Maintenance Facility in Skokie, Illinois (USA) by the CTA service team.