Search
Search text
Results 311–320 of 756
Keeping pace with the times | Liebherr-Aerospace & Transportation SAS
Liebherr-Aerospace is already using the HVOF process in series production – not just for the exterior, but also for the interior of components.
What’s behind the type designation of Liebherr mobile construction cranes?
Let’s go back a little in history: there were already smaller Liebherr MK cranes in the 80s and 90s. These were built on standard lorries.
Manoeuvring in narrow points: LTM with RemoteDrive
Since the feature was introduced for the two LTM cranes, several mobile cranes with RemoteDrive have already been delivered to customers all over the world.
Ultra-precise teamwork - saving lives by helicopter
The latter involves flying patients who are already under medical care from one hospital to another: this may be because they need a particular operation or specialist treatment that is only available
https://www.liebherr.com/en-ca/group/magazine/ultra-precise-teamwork/ultra-precise-teamwork-7648295
Whisky Waves
There, ‘Carly’, the landing craft painted bright red, is already waiting to take the LTM 1230-5.1 to the Isle of Jura.
The Construction Site Booster
When a heavy transporter laden with components arrives, the assembly team and João Neves, the crane operator of the LTR 1100, are already waiting.
Not an ordinary partnership
Monnis, alongside Liebherr, is already in discussions with Mongolia’s leading mining companies about implementing these technologies, and we are confident that this collaboration will help drive significant
30 years of trucking along in Newport News
‘A lot of exciting work has already been completed here at Newport News!’ exclaims Chris Guilford, general manager, facilities and maintenance, Liebherr Mining Equipment Newport News Co.
Why don’t you become a hairdresser?
Her mother has already trained as a metalworker. She often told Sina about her work and showed her pictures.
Liebherr MK 88 Plus masters 1,600 lifts in the Swiss Alps
It will replace the 90-year-old, damaged dam already there. The foundations for the planned concrete mixing plant had to be completed near the future dam’s location before the onset of winter.