Search
Search text
Results 461–470 of 933
Liebherr tower cranes: High above the rooftops of Paris
The Liebherr Derrick was taken to the roof of the Grande Arche in parts using a site elevator. The Derrick was then erected before starting on the erection work for the 202 EC-B 10 Litronic.
Liebherr MK 88 mobile construction crane
Crane driver Stephan Achenbach managed to hoist all the scaffold parts safely around the steeple within around two hours in bright sunshine with no wind – it was almost as if God was helping him.
Logistical masterpiece in the Alps
“And not just when bringing in the crane parts. The assembly of the lattice booms in particular demanded a lot from us.”
Singapore – high tech in the glittering metropolis
Furthermore, our outlet is used as a customer service centre with an adjoining spare parts warehouse.
The duty cycle crawler crane that changed Liebherr
Besides original replacement parts, even high-tech from the 21st century found its way into the HS 870; despite a long search, replacement parts couldn’t be found for the headlight covers, “we then replicated
https://www.liebherr.com/en-ca/group/magazine/hs-870/hs-870-3721274
Variable support base for greater safety and increased lifting capacity
More than 95 % of all spare parts available within 24 hours. This service improves the time that your crane is available and makes your work significantly easier.
First operations of the 470 EC-B
With a radius of 60 metres, the crane can transport heavy loads over long distances and position all the parts precisely where they are required.
Rotary drilling tools for Kelly drilling
Special drilling tools 18 Belling buckets 19 Boulder extractor 19 Casings and accessories, cutting shoes and casing drivers 20 Casings 21 Casing accessories 22 Cutting shoes 22 Casing drivers 23 Wear parts
https://assets-cdn.liebherr.com/versions/4ce0480e-4dee-4858-9f79-9c35f6ffa110/original/
A crane job between splendour and megalomania
They had bolted together the protective hoods, each made up of three large pre-assembled parts, over the previous few days in the palace garden.
Facts and Figures
However, with the recovery of the global markets from the second quarter onwards, manufacturing companies have faced difficulties in procuring a wide range of raw materials, components and electronic parts