Search
Search text
Results 401–410 of 902
“Grand Paris” – 100 EC-H impressive performance
This is in the immediate vicinity of the “Grand Paris” sites which means that the service technicians can source spare parts quickly.
https://www.liebherr.com/en-ca/tower-cranes/applications/1000-ec-h-grand-paris-4020394
“Grand Paris” – 100 EC-H impressive performance
This is in the immediate vicinity of the “Grand Paris” sites which means that the service technicians can source spare parts quickly.
https://www.liebherr.com/en-ca/tower-cranes/applications/1000-ec-h-grand-paris-4020377
Liebherr tower cranes build world’s third largest double-curvature arch dam
Being able to rely on both the supply of spare parts and on the services provided was decisive for us.” Tower cranes shape the landscape of every construction site.
https://www.liebherr.com/en-ca/tower-cranes/applications/job-report-dam-turkey-4020401
HS 8200 Einsatzbericht Grönland
The region is only supplied by a ship once a week which also brings parts and equipment for Munck Civil Engineering.
https://assets-cdn.liebherr.com/versions/86a6abb5-d3b2-43c2-83e4-a84046672886/original/
Interview HLC 295000
Reinhard Krappinger: The requirements were primarily to lift high loads from plant parts and foundation structures.
https://www.liebherr.com/en-ca/group/magazine/heavy-lift-crane/heavy-lift-crane-3721208
Mining
Liebherr’s Mining division continuously invests in the expansion of the service network through its own branches: in the supply of spare parts, component reconditioning and the qualification and training
An ode to the crane
That means that parts in a real crane that measure 4 cm instead measure just 2 mm in the model. The parts are made of pine and beech with some of them also being oak. “Beech is hard, pine is soft.
Datenblatt 195 HC-LH 6/12
Halterungen und Anbauteilen Weight incl. mounting and add-on parts Indication du poids, fixations et pièces à monter incl.
https://assets-cdn.liebherr.com/versions/644b79b8-2362-4a53-9196-760e2b77da6e/original/
Datasheet 195 HC-LH 6/12 FEM
Halterungen und Anbauteilen Weight incl. mounting and add-on parts Indication du poids, fixations et pièces à monter incl.
https://assets-cdn.liebherr.com/versions/c30861f0-4f77-4232-8947-bb63a740345b/original/
Drilling rigs LB series | Liebherr deep foundation
Wear parts (chisels, teeth, blocks) One leader head for all applications and operating modes The leader top is designed for various drilling axes.
https://www.liebherr.com/en-ca/deep-foundation/machines/drilling-rigs-4079617