
Press releases | 02/05/2018
Highest precision: Liebherr Duty Cycle Crawler Crane Shows Great Skill on Prehistoric Ground
- HS 8100 HD fitted with grab installs slurry walls
- Archaeological excavations during the construction work
- Prehistoric stilt dwellings and listed buildings within the jobsite
Installation of slurry walls and archaeological excavations on one jobsite: this is the case in Zurich where a Liebherr HS 8100 HD is currently deployed. Due to this fact, the deep foundation work must be carried out with utmost care and highest precision.



