
BRIDGE RENOVATION
Job report Kelly drilling using the LIPOS positioning system
The railway bridge in Koblenz (CH) was renovated
The renovation of the 130-year-old pillars was carried out with four piles each. The piles have a diameter of 1500 mm and a depth between 12 and 20 metres.
Jobsite video
Get in touch
If you have any further questions, please contact our local sales or service team:








