News | 22/03/2023
Vergona Crane Co., Inc. purchases a Liebherr LTM 1150-5.3 at Conexpo 2023
Vergona Crane Co., Inc. orders a Liebherr LTM 1150-5.3, known as the jewel for any fleet.
News | 22/03/2023
Vergona Crane Co., Inc. orders a Liebherr LTM 1150-5.3, known as the jewel for any fleet.
New Jersey based Vergona Crane Co., Inc. purchases a Liebherr LTM 1150-5.3 at Conexpo 2023, the largest construction tradeshow in North America. Vergona Crane specializes in crane rentals, trucking services, and warehousing throughout New York and New Jersey.
With a maximum lifting capacity of 175 USt (150 t) and a long telescopic boom, the LTM 1150-5.3 is an excellent addition to Vergona’s fleet. The mobile crane is also compatible with many other Liebherr cranes with lifting capacities between 220,500 lbs and 396,830 lbs (100 t and 180 t).
With the LTM 1150-5.3, Liebherr has continued a single-engine strategy with a mechanical drive unit for the superstructure. The weight reduction created by the elimination of the superstructure engine is used to deliver a longer boom and more lifting capacity.

10/09/2026
Press releases
Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung
A new residential development is under construction in Ho Chung, Sai Kung. Foundation and excavation and lateral support works have been underway since December 2024 and are expected to continue until end of 2026. Two Liebherr NC-B 12-70 tower cranes are handling material logistics on the confined site.

03/09/2026
Press releases
Water for a whole valley: Liebherr Fibre crane at work high in Val Trompia
In Bovegno, Italy, work is progressing on a new drinking water treatment plant designed to supply thousands of residents and businesses across the Val Trompia region. Handling the major lifting tasks on site is a Liebherr 240 EC-B Fibre tower crane, its fourth deployment and the first of its kind to arrive in the country.

27/08/2026
Press releases
Precision over Lyon: Liebherr tower cranes conquer one of France’s most complex urban builds
Nestled between a major shopping centre and a 115 metre tower with barely room to breathe, the Ki construction site in Lyon left no margin for error. Three Liebherr EC-B flat-top tower cranes spent 14 months proving that the right technology, when precisely configured, can turn one of France's most constrained urban sites into a functioning, efficient construction operation.