High shelving system with more than 60,000 pallet spaces
The warehouse completed during the first construction phase offers a total of 46,800m² for spare parts. For the efficient storage of Liebherr spare parts, an automatic 36m high shelving system was erected in nine aisles with 60,390 pallet spaces. An energy-efficient pallet loading and unloading device is used to pick and place the spare parts.
With a further 29,380 manual pallet spaces, the innovative small parts warehouse with a total of 122,000 box spaces forms the core element of the intralogistics centre. This automatic box warehouse with eight aisles across and eight aisles down has a special modular layout. This technology is the basis for a high level of safety against failure as well as maximum performance. Initially, the box warehouse will have an output of 1,200 boxes per hour to the eight commissioning areas attached to it. When at its full potential with 24 commissioning areas, the output is in excess of 3,500 spare parts per hour.
When commissioned from the box warehouse, the items are packaged using a so-called pick and pack procedure, where the ordering structure permits. The flow of goods is automated using conveyor technology for the boxes as well as a large number of dispatch-ready packaged items throughout the warehouse. There are additional ergonomic workstations for customer-specific commissioning in the hall and, last but not least, sufficient space in and around the hall for surface storage of large and heavy components.
Professional spare parts logistics, high level of safety against failure
Orders from different areas of the warehouse are collected in a specially arranged commissioning zone. Seamlessly linked to this are fifteen packing belts and the dispatch areas for the 22 dock levellers. The spare parts are then loaded onto trucks and vans from these points.
In the automated warehouse systems, as well as on the conveyor technology, preventative maintenance and repair in the event of individual system failure, will be possible while the system is in operation. The logistics software makes allowance for the redundancy of IT systems. To safeguard the goods and to avoid complete failure of the system as a result of fire, a high investment in state-of-the-art fire protection technology was made.
Special attention was paid by the Liebherr logistics technicians from the dedicated service organisation to shorten the order processing times. This facilitates the reliable dispatch of goods on the same day for many European countries even if the order is received late from the sales organisations. Other service features are the use of modern picking and placing methods such as FiFo (First-in-First-out) and the batch-specific storage of all delivery positions.