Отчёты об эксплуатации
Job report HS 8130 HD harbour dredging in Vado Ligure
PDF (1,4 MB)
Job report HS 8030 HD river dredging in Karlsruhe
PDF (2,0 MB)
Job report HS 8070 HD duty cycle crawler crane in dragline operation
PDF (1,3 MB)
Job report HS 8100 HD slurry wall installation at Suez Canal
PDF (821 KB)
Job report HS 8100 HD slurry wall installation in Barcelona
PDF (790 KB)
Job report HS 8100 HD with slurry wall grab HSG 5-18 L in Milan
PDF (767 KB)
Job report HS 8100 HD with slurry wall grab in Zurich
PDF (1,1 MB)
Job report HS 8130 HD & HS 885 HD in Hong Kong Reverse circulation air injection drilling
PDF (2,8 MB)
Job report HS 8130 HD dynamic soil compaction in Helsinki
PDF (708 KB)
Job report HS 8130 HD in dredging application in Ticino, Switzerland
PDF (574 KB)
Job report HS 8130 HD reverse circulation drilling in Hong Kong
PDF (2,1 MB)
Job report HS 895 HD sand quarrying in Australia: 400 t/h
PDF (1,7 MB)
Job report LB 20 Kelly drilling in Bad Buchau, Germany
PDF (2,2 MB)
Job report LB 28 and LB 36 Kelly drilling in Neckarwestheim
PDF (1008 KB)
Job report LB 36 bridge renovation in Koblenz, CH
PDF (1,5 MB)
Job report LB 36 Kelly drilling in Ibaqué, Columbia
PDF (814 KB)
Job report LRB 355 full displacement drilling in Botero, Kolumbia
PDF (725 KB)
Job report LRB 355 piling and drilling double rotary drilling
PDF (1,1 MB)
Job report LRB 355 piling and drilling double rotary drilling in Frankfurt
PDF (4,3 MB)
Job report slurry wall cutter LSC 8-18 L in Munich
PDF (2,0 MB)
The Positioning System LIPOS supports CFA drilling
PDF (1,4 MB)
The positioning system LIPOS supports Double Rotary Drilling
PDF (1,8 MB)
Отчёт о работе Гидравлический канатный экскаватор HS 8100 HD - Дноуглубительные работы
PDF (806 KB)
Отчёт о работе Гидравлический канатный экскаватор HS 8300 HD
PDF (826 KB)