Землеройная техника

Listicles | 28.03.2025

9 must-see giants at Liebherr’s booth at Bauma

LG 1800-1.0 lattice boom crane

520 EC-B 20 Fibre top-slewing crane

T 264 Battery Electric mining truck

R 9400 E mining excavator

Mobilmix 4.0 mixing plant

LH 60 M High Rise Port E material handling machine

LR 1400.1 SX crawler crane

PR 776 eighth generation crawler dozer

R 998 SME Litronic

Contacts

Anja Schenk
Anja Schenk
Liebherr-International AG General-Guisanstrasse 6 5415 Nussbaumen Switzerland
+41 79 530 43 71

Вас также может заинтересовать

  • A step up: Schweri opts for new Liebherr LTM 1300-6.4 mobile crane

    06.10.2026

    Press releases

    A step up: Schweri opts for new Liebherr LTM 1300-6.4 mobile crane

    Schweri Autokranbetriebe GmbH & Co. KG is putting an LTM 1300-6.4 into service. With this 300-tonne crane, the company is increasing the lifting capacity of its fleet and responds to increasing demands in wind power, industrial and precast concrete installation projects.

  • Greater confidence through new experience: Liebherr increases period of use of Fibre ropes for tower cranes

    02.10.2026

    Press releases

    Greater confidence through new experience: Liebherr increases period of use of Fibre ropes for tower cranes

    Liebherr is increasing the overall service life of its Fibre ropes from 14 to 16 years, with the decisive period of use rising to up to 12 years. This is based on multi-year ageing trials on test rigs and analyses of ropes already in field. The new ruling applies automatically to all new ropes and those already in the field. This step forms part of Liebherr's ongoing path towards establishing Fibre technology as the new standard in the tower crane market.

  • Pipe Mikado at the cement works: Liebherr LTM 1650-8.1 moves heavy loads in confined spaces

    01.10.2026

    Press releases

    Pipe Mikado at the cement works: Liebherr LTM 1650-8.1 moves heavy loads in confined spaces

    At the Holcim cement plant in Dotternhausen, a Liebherr LTM 1650-8.1 mobile crane from Wiesbauer GmbH & Co. KG mastered a challenging installation lift: two pipes, each weighing 33 tonnes, had to be hoisted into a new flue gas cleaning plant between existing pipes.