In terms of performance, the unplugged and conventional machines equally strong. They, underline Liebherr's open technology approach: the unplugged series and conventionally powered machines from Liebherr do not compete, they complement each other. It all depends on the construction site.
View of a construction site in an inner-city area: little space, close to buildings and good infrastructure - exactly the right area for the Liebherr unplugged series to get to work. The battery-powered machines are nearly noiseless and emission-free - which benefits the staff of the construction site as well as local residents.
Change of location to a construction site on a river: remote and hardly any infrastructure - in this case, Liebherr’s conventionally powered construction machines are exactly the right machines for the job. Equipped with the latest generation of diesel engines, they perform even in remote locations.
No matter where a construction site is located: Liebherr-Werk Nenzing GmbH offers the best solution for both types.
In this video interview Sascha Bechter and Michael Flecker, two experts from Liebherr-Werk Nenzing, explain when which technology is best suited and what the advantages of each technology are. They also look ahead to Bauma 2022 and reveal which machines will be on display in Munich.

2026. 10. 13.
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.

2026. 10. 08.
Press releases
THW builds Danube bridge using four Liebherr LTC 1050-3.1 cranes
In Tuttlingen, southern Germany, four small Liebherr cranes have achieved great things: as a temporary replacement for a Danube bridge due for demolition, the LTC 1050-3.1 compact cranes erected a 70-metre-long river crossing as part of a civil defence exercise.

2026. 10. 07.
Press releases
Replacing the European Parliament’s air-conditioning system in Luxembourg required a long reach, precise planning and meticulously coordinated logistics. A Liebherr LTM 1650-8.1 mobile crane from STEIL Kranarbeiten in Trier lifted six old components from the roof and installed the new units.