
News | 2025. 04. 14.
MPM: Strong in mining with mobile cranes from Liebherr
The Chilean company MPM has taken delivery of five new Liebherr mobile cranes: an LTM 1230-5.1, LTM 1250-5.1, LTM 1300-6.3, LTM 1450-8.1 and an LTM 1750-9.1.
News | 2025. 04. 14.
The Chilean company MPM has taken delivery of five new Liebherr mobile cranes: an LTM 1230-5.1, LTM 1250-5.1, LTM 1300-6.3, LTM 1450-8.1 and an LTM 1750-9.1.
The new machines will be used in the mining sector and complement MPM’s fleet, which now comprises 30 Liebherr cranes. “Liebherr has been a reliable partner for us for over ten years – we appreciate the quality of the cranes as well as the excellent service on site,” explains Daniel Vega, CEO of MPM. The Santiago-based company has specialised in industrial maintenance and assembly, earthmoving and machine rental since it was founded in 2008.
MPM realises numerous large-scale projects in Chilean mining with innovative and efficient solutions. By ordering the new machines, the Chilean company is emphasising its confidence in the technical performance and flexibility of Liebherr cranes.


2026. 10. 13.
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.

2026. 10. 08.
Press releases
THW builds Danube bridge using four Liebherr LTC 1050-3.1 cranes
In Tuttlingen, southern Germany, four small Liebherr cranes have achieved great things: as a temporary replacement for a Danube bridge due for demolition, the LTC 1050-3.1 compact cranes erected a 70-metre-long river crossing as part of a civil defence exercise.

2026. 10. 07.
Press releases
Replacing the European Parliament’s air-conditioning system in Luxembourg required a long reach, precise planning and meticulously coordinated logistics. A Liebherr LTM 1650-8.1 mobile crane from STEIL Kranarbeiten in Trier lifted six old components from the roof and installed the new units.