News | 2015. 04. 28.
News | 2015. 04. 28.
Last week, Liebherr-Werk Nenzing GmbH welcomed their customers from the construction industry at the factory in Vorarlberg. Under the motto “Liebherr Meets Friends“, customer days of Liebherr-Werk Nenzing GmbH took place last Friday and Saturday. About 900 customers from all over the world visited the factory in Austria - despite poor weather conditions.
Liebherr introduced three world premieres in the field of special deep foundation equipment with a varied programme: the LRB 355 piling and drilling rig, the HS 8130 HD duty cycle crawler crane and the first hydraulic vibrator that had completely been designed and built by Liebherr.
In the specially designed technology pavilion, Liebherr demonstrated their innovative technologies, like the simulator for construction machinery or the hydraulic hybrid drive Pactronic®. These technologies were presented in a one-hour-lasting multimedia show. After machine demonstrations and technology presentations, an evening show with Liebherr machines took place. Duty cycle crawler cranes as well as piling and drilling rigs were used for mixing a cocktail.
With this year’s customer days Liebherr strengthened its strong bonds and long-lasting partnership with national and international customers.

2026. 10. 13.
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.

2026. 10. 08.
Press releases
THW builds Danube bridge using four Liebherr LTC 1050-3.1 cranes
In Tuttlingen, southern Germany, four small Liebherr cranes have achieved great things: as a temporary replacement for a Danube bridge due for demolition, the LTC 1050-3.1 compact cranes erected a 70-metre-long river crossing as part of a civil defence exercise.

2026. 10. 07.
Press releases
Replacing the European Parliament’s air-conditioning system in Luxembourg required a long reach, precise planning and meticulously coordinated logistics. A Liebherr LTM 1650-8.1 mobile crane from STEIL Kranarbeiten in Trier lifted six old components from the roof and installed the new units.