News | 2017. 07. 14.
News | 2017. 07. 14.
The order comprises the delivery of 33 armoured recovery cranes with model name G-BKF and 38 G-LTM 1090-4.2 mobile cranes. These are 90-tonne class telescopic cranes which also feature armoured driver's cabins and armoured crane cabins.
The G-BKF from Liebherr is an armoured recovery crane on a four-axle mobile crane chassis. It has excellent off-road capability and great manoeuvrability. The G-BKF can be used flexibly and economically since it is equipped both to hoist loads and also to recover vehicles. Its 20.9 meter telescopic boom enables the G-BKF to handle loads up to 20 tonnes in weight quickly and precisely. Its two recovery winches and towing device at the rear enable it to recover and tow a wide range of different vehicles.
The G-LTM 1090-4.2 ordered by the German Army is a four-axle mobile crane derived from the standard LTM 1090-4.2 version with an armoured driver's cabin and an armoured crane cabin. It has a 35.7 metre telescopic boom and a recovery winch at the rear.

2026. 10. 13.
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.

2026. 10. 08.
Press releases
THW builds Danube bridge using four Liebherr LTC 1050-3.1 cranes
In Tuttlingen, southern Germany, four small Liebherr cranes have achieved great things: as a temporary replacement for a Danube bridge due for demolition, the LTC 1050-3.1 compact cranes erected a 70-metre-long river crossing as part of a civil defence exercise.

2026. 10. 07.
Press releases
Replacing the European Parliament’s air-conditioning system in Luxembourg required a long reach, precise planning and meticulously coordinated logistics. A Liebherr LTM 1650-8.1 mobile crane from STEIL Kranarbeiten in Trier lifted six old components from the roof and installed the new units.