News | 2020. 03. 13.
News | 2020. 03. 13.
“I’m thrilled to be the first customer in the country to receive an LTM 1110-5.1,” said Cranes, Inc. President Rob Weiss. “We’ve always been kind of a pioneer with Liebherr. We’ve had the first LR 1350s in the country. We’ve been the first for a lot of products. I have a lot of faith and trust in the product and I think nobody makes a better crane and we’ve always been proud to feature Liebherr in our fleet.”
The LTM 1110-5.1 combines excellent lifting capacity with a 171’ (52 meter) telescopic boom and high worldwide mobility. The crane, first introduced at Bauma 2019, has a wide range of driving configurations, which allow it to operate on roads all over the world.
The LTM 1110-5.1 is equipped with VarioBase Plus, Liebherr’s reliable and innovative support base technology. The rear outriggers have a double-stage design which allows for a wider supporting base at the rear of the crane, resulting in increased load capacities.
Cranes, Inc. also took delivery of the first Liebherr LR 1400’s and LTC 1055-3.1’s in US. “The people and the technology make Liebherr a phenomenal company. They’re great to work with—the machines and the people,” Weiss said.

2026. 10. 13.
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.

2026. 10. 08.
Press releases
THW builds Danube bridge using four Liebherr LTC 1050-3.1 cranes
In Tuttlingen, southern Germany, four small Liebherr cranes have achieved great things: as a temporary replacement for a Danube bridge due for demolition, the LTC 1050-3.1 compact cranes erected a 70-metre-long river crossing as part of a civil defence exercise.

2026. 10. 07.
Press releases
Replacing the European Parliament’s air-conditioning system in Luxembourg required a long reach, precise planning and meticulously coordinated logistics. A Liebherr LTM 1650-8.1 mobile crane from STEIL Kranarbeiten in Trier lifted six old components from the roof and installed the new units.