The Arthur Ashe Stadium in New York is the largest tennis stadium in the world and the venue for the US Open. The stadium is now getting a retractable roof to avoid the frequent match postponements at the US Open caused by rain. Over a period of ten months, a Liebherr LR 11000 crawler crane and two LR 1600/2 operated by American crane contractor Buckner HeavyLift Cranes have been putting the steel structure for the roof in place.
The Liebherr crawler cranes were a central feature of the planning and building of the structure. The space available at the stadium is very constricted. "The site was logistically challenging. A great deal of planning was required just for the assembly and disassembly of the cranes. Liebherr LR 11000 and LR 1600/2 crawler cranes feature an efficient erection process and short set-up times. That, of course, helps to keep costs down", reports Kevin C Long, Project Manager at Buckner HeavyLift Cranes.
After completing this project the Buckner team looked back at a successful job completed: "The Liebherr crawler cranes performed extremely well throughout the project. During the winter months we had to struggle with extreme weather conditions but the cranes continued to be reliable through very low temperatures."

2026. 10. 13.
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.

2026. 10. 08.
Press releases
THW builds Danube bridge using four Liebherr LTC 1050-3.1 cranes
In Tuttlingen, southern Germany, four small Liebherr cranes have achieved great things: as a temporary replacement for a Danube bridge due for demolition, the LTC 1050-3.1 compact cranes erected a 70-metre-long river crossing as part of a civil defence exercise.

2026. 10. 07.
Press releases
Replacing the European Parliament’s air-conditioning system in Luxembourg required a long reach, precise planning and meticulously coordinated logistics. A Liebherr LTM 1650-8.1 mobile crane from STEIL Kranarbeiten in Trier lifted six old components from the roof and installed the new units.