Gru a torre

Press releases | 10/09/2026

Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung

Contacts

Shannon Korff, Marketing Specialist
Shannon Korff
Marketing Specialist
Liebherr-Werk Biberach GmbH Memminger Straße 120 88400 Biberach an der Riß Germany

Anche questo potrebbe interessarvi

  • Five questions that show why planning a tower crane deployment is more complex than you might think

    22/09/2026

    Listicles

    Five questions that show why planning a tower crane deployment is more complex than you might think

    On spectacular construction sites, it's the structures that take the spotlight. But building bridges, tunnels or skyscrapers in the first place often demands equally extraordinary crane concepts. From the Sagrada Família in Barcelona to the Fehmarnbelt Tunnel in Denmark, Liebherr supports demanding tower crane deployments worldwide. Max Widder, Head of Project Planning at Tower Crane Solutions, gives insight into the challenges behind some of the most complex crane projects in the world.

  • Acqua per un’intera valle: la gru a Fibre Liebherr al lavoro sulle alture della Val Trompia

    03/09/2026

    Comunicati stampa

    Acqua per un’intera valle: la gru a Fibre Liebherr al lavoro sulle alture della Val Trompia

    A Bovegno, in Italia, procedono i lavori per la realizzazione di un nuovo impianto di trattamento dell’acqua potabile destinato ad approvvigionare migliaia di residenti e aziende in tutta la regione della Val Trompia. A gestire le principali operazioni di sollevamento in cantiere è una gru a torre Liebherr 240 EC-B Fibre, al suo quarto impiego e la prima del suo genere ad arrivare nel Paese.

  • Precision over Lyon: Liebherr tower cranes conquer one of France’s most complex urban builds

    27/08/2026

    Press releases

    Precision over Lyon: Liebherr tower cranes conquer one of France’s most complex urban builds

    Nestled between a major shopping centre and a 115 metre tower with barely room to breathe, the Ki construction site in Lyon left no margin for error. Three Liebherr EC-B flat-top tower cranes spent 14 months proving that the right technology, when precisely configured, can turn one of France's most constrained urban sites into a functioning, efficient construction operation.