Listicles | 28/03/2025

9 géants à ne pas manquer au stand Liebherr de la Bauma

Grue à flèche en treillis LG 1800-1.0

Grue à partie tournante supérieure 520 EC-B 20 Fibre

Tombereau T 264 Battery Electric

Pelle minière R 9400 E

Centrale à béton Mobilmix 4.0

Engin de manutention LH 60 M High Rise Port E

Grue sur chenilles LR 1400.1 SX

Bouteur PR 776 de la génération 8

R 998 SME Litronic

Contacts

Anja Schenk
Anja Schenk
Liebherr-International AG General-Guisanstrasse 6 5415 Nussbaumen Suisse
+41 79 530 43 71

Cela pourrait également vous intéresser

  • Three Liebherr cranes support heritage-compliant renovation of the Dutch government quarter

    13/11/2026

    Press releases

    Three Liebherr cranes support heritage-compliant renovation of the Dutch government quarter

    Three Liebherr 340 EC-B 12 flat-top cranes are supporting the renovation of the historic Binnenhof in The Hague. The construction company J.P. van Eesteren has been using the brand-new cranes for material transport and assembly work at the parliament and ministry buildings. Jib lengths of up to 75 metres and a compact design make it possible to work in the confined space of the listed building ensemble.

  • AL.GIS. Sollevamenti S.r.l. boosts crane fleet with used LTM 1500-8.1 mobile crane from Liebherr

    11/11/2026

    Press releases

    AL.GIS. Sollevamenti S.r.l. boosts crane fleet with used LTM 1500-8.1 mobile crane from Liebherr

    The Italian crane and heavy transport company AL.GIS. Sollevamenti S.r.l., based in Marcianise, near Naples, has expanded its crane fleet with a used Liebherr LTM 1500-8.1 mobile crane.

  • Liebherr supplies two new Betomix batching plants to Willaert Bouwmaterialen

    10/11/2026

    Press releases

    Liebherr supplies two new Betomix batching plants to Willaert Bouwmaterialen

    With two new Liebherr Betomix 3.0 concrete batching plants, Willaert Bouwmaterialen is investing in the future of its ready-mix concrete production. Thanks to modern mixing technology, a sophisticated plant concept and optimally prepared site conditions, both plants were installed and commissioned in just 13 weeks. In addition to high production capacity, key factors in favour of the Liebherr plants were quality, reliability and the long-standing partnership.