News | 24.07.2018
News | 24.07.2018
The Liebherr Tower Cranes Division is entering into a development partnership with the Center Construction Robotics at RWTH Aachen. The start of the partnership was signalled by a kick-off event held on 12 July 2018 in Aachen.
Together with other well-known companies such as KUKA and Autodesk, Liebherr's objective at the Center Construction Robotics is to redesign the construction site of the future and to redevelop digitalisation from the pre-production phase, throughout the added value chain to the semi-automated construction site.
In addition to family shareholder Stéphanie Wohlfarth, the kick-off event was attended by Dominique Tasch (Engineering and Development Managing Director), Stefan Strauch (Production Managing Director), Joachim Klein (Head of Production Planning), Robert Bramberger (Engineering and Development Department Manager – Service & Data) and Sebastian Sturm (Market Management Department Manager) from the Liebherr Tower Cranes Division. Uwe Rechtsteiner from Liebherr-International AG was also present.
"We have discovered a very promising environment in Aachen with the concept of the Center Construction Robotics, which enables everybody concerned to adopt a designer role for the digital construction site. As a result of its renowned partners, Liebherr believes there is a good opportunity to make the vision of the construction site of the future reality," says Dominique Tasch, Engineering Managing Director of Liebherr-Werk Biberach GmbH and the Liebherr Tower Cranes Division.

02.10.2026
Communiqués de presse
Liebherr augmente la durée de vie totale de ses câbles en fibres de 14 à 16 ans, leur durée d’utilisation effective peut atteindre 12 ans. Ces conclusions s’appuient sur des essais de vieillissement menés sur plusieurs années sur des bancs d’essai et sur des analyses de câbles utilisés sur le terrain. Cette règle s’applique automatiquement à tous les câbles, qu’ils soient neufs ou déjà en service.

22.09.2026
Listicles
Five questions that show why planning a tower crane deployment is more complex than you might think
On spectacular construction sites, it's the structures that take the spotlight. But building bridges, tunnels or skyscrapers in the first place often demands equally extraordinary crane concepts. From the Sagrada Família in Barcelona to the Fehmarnbelt Tunnel in Denmark, Liebherr supports demanding tower crane deployments worldwide. Max Widder, Head of Project Planning at Tower Crane Solutions, gives insight into the challenges behind some of the most complex crane projects in the world.

10.09.2026
Press releases
Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung
A new residential development is under construction in Ho Chung, Sai Kung. Foundation and excavation and lateral support works have been underway since December 2024 and are expected to continue until end of 2026. Two Liebherr NC-B 12-70 tower cranes are handling material logistics on the confined site.