Job reports

Job report HS 8070 HD duty cycle crawler crane in dragline operation

PDF (1.3 MB)

Job report HS 8100 HD slurry wall installation at Suez Canal

PDF (821 KB)

Job report HS 8100 HD dredging in Hamburg

PDF (847 KB)

Job report HS 8100 HD slurry wall installation in Barcelona

PDF (790 KB)

Job report HS 8130 HD in dredging application in Ticino, Switzerland

PDF (574 KB)

Job report HS 8300 HD in dredging application in Piombino

PDF (713 KB)

Job report LB 28 and LB 36 Kelly drilling in Neckarwestheim

PDF (1008 KB)

Job report LB 36-410 Kelly drilling

PDF (822 KB)

Job report LRB 355 piling and drilling double rotary drilling

PDF (1.1 MB)