HS 8200 Duty cycle crawler crane

Based on the successful HS 895 HD, the HS 8200 is a new development that has been designed to specifically meet with customer requirements. The 200-tonne duty cycle crawler crane combines safety, performance and efficiency as well as a high level of control comfort. With a 10 % increase in lifting capacity as well as the use of 35-tonne free-fall winches, this design sets new standards for material handling.
Max. lifting capacity 200 t
Engine power 750 kW
Max. winch line pull 2 x 350 kN
Max. main boom 68.00 m

Features

Designed for dynamic tasks

Designed for dynamic tasks

The uppercarriage with its robust design is mounted on a solid undercarriage featuring wide tracks and long crawlers for a high level of stability. more

Flexibility in operation

Flexibility in operation

Thanks to the modular concept in combination with a variety of equipment options, the crane can be configured for its special job: This includes working with slurry wall grab and casing oscillator, material loading with grab or drag bucket, dynamic soil compaction as well as dredging. more

Intelligent crane control

Intelligent crane control

The crane control system offers a multitude of programme and control options. Color displays clearly provide service and machine data. All movements can be carried out simultaneously. The operator thus benefits from a facilitated handling of the rig. Furthermore, quick working cycles are achieved.

Engine

Engine

The latest engine from Liebherr convinces through lower noise emission and fuel consumption and, at the same time, a 10 % increase in engine power. more

Safety

Safety

The uppercarriage has integrated railings, walkways and pedestals allowing safe access at all times. Oil levels for hoist winches and swing drives are displayed in the operator’s cabin meaning personnel no longer have to go onto the roof of the uppercarriage to carry out daily maintenance.

High service availability

High service availability

A global service network with experienced technicians and fast access to spare parts ensure high machine availability and a long product service life. more

Transport

Transport

Thanks to the new design of the machine, the transport weight can be easily reduced to 47 tonnes.

more

Technical data

Max. lifting capacity 200 t
Min. transport width 3,500 mm
Min. transport height 3,450 mm
Min. transport weight 47 t
Engine power 750 kW
Max. winch line pull 2 x 350 kN
Max. main boom 68.00 m
Boom length in grab operation 50.00 m
Boom length in dragline operation 50.00 m
Operating weight 172 t
Travel speed 1.30 km/h
Max. depth dragline operation 22.00 m
Max. capacity of dragline bucket 7.60 m³
Max. capacity of clamshell 14.00 m³
at radius 20.00 m

Downloads

Accessories

Backup control

Backup control

The backup control allows for limited operation of the machine in case of a partial or full break down of the control system.

Control system for dragline operation

Control system for dragline operation

The "interlock" control system for dragline operations ensures powered lowering with drag winch, while lifting of the bucket with the hoist winch. This reduces fuel consumption and minimizes wear of the free fall brake.

Virtual crane operation plan

Virtual crane operation plan

Confined spatial conditions, as well as special ground conditions, are key factors for the configuration of the device. As a solution, with the "Crane Planner" Liebherr offers software for selecting the optimal crawler crane and the appropriate configuration for the respective use. more

Electronic evaluation of working processes

Electronic evaluation of working processes

With the PDE process data recording system machine data is recorded during the working process. With PDR these data can be managed, displayed tabularly or graphically, and analyzed. In combination with the telematics system LiDAT these reports can be easily generated from the office. more

Fleet management and teleservice

Fleet management and teleservice

The data transmission and positioning system “LiDAT” provides important information on the operation of the machine. With these data the operation becomes more efficient. Various additional modules allow machine data reporting or access through service engineers via teleservice. more

Automatic engine stop

Automatic engine stop

The machine can optionally be equipped with an automatic engine stop control. Thanks to this feature it automatically switches off during longer work breaks after evaluating several machine parameters. This is fuel saving and environmentally friendly.

Eco silent mode

Eco silent mode

With the eco silent mode the engine speed can be reduced to a predefined, required level. With this feature a notable reduction in diesel consumption can be achieved without any impact on operational output. Noise emissions are thus also lowered.

Counterweight

Counterweight

Due to various counterweight designs, the machine also proves itself in lifting operation.

more

Applications

Deep compaction

Deep compaction

For deep compaction the building ground is compacted and so improved using vibration.

Vibrating

Vibrating

Vibrating allows for installing and extracting elements using harmonious vibration. more

Reverse circulation air injection drilling

Reverse circulation air injection drilling

Reverse circulation air injection drilling is a jetting-assisted drilling method applied to produce boreholes of very large diameters and enormous depths. more

Drilling with bored pile grab

Drilling with bored pile grab

Drilling with bored pile grab is a dry drilling method loosening the building ground either by cutting or by impacting – depending on the working tool used. more

Impact compaction

Impact compaction

For impact compaction a tamper weight is dropped to the ground from a great height.

Slurry wall installation with hydromill

Slurry wall installation with hydromill

With the help of cutting wheels the building ground is broken up and crushed. more

Slurry wall installation with grab

Slurry wall installation with grab

A clamshell grab excavates the slurry wall panels.

more
Grab operation

Grab operation

Fitted with a range of different mechanical or hydraulic grabs, duty cycle crawler cranes are used for typical material handling tasks with large working radii.

more
Dragline operation

Dragline operation

Typical applications with dragline bucket include the excavation of various bulk goods, such as gravel and sand, from rivers or quarries.

more

Videos

HS 8200 in dragline operation

HS 8200 in dragline operation

Call up video

New HS 8200 - doing what we do best

New HS 8200 - doing what we do best

Call up video

Duty cycle crawler cranes - range of applications

Duty cycle crawler cranes - range of applications

Call up video

Training

Training

Call up video

Video - Automatic engine stop control explained

Video - Automatic engine stop control explained

Call up video

Dredging Assistant

Dredging Assistant

Call up video

Diagnosis screen and remote control

Diagnosis screen and remote control

Call up video

Attachments

Sales and Service

Our customers can rely on a worldwide sales and service network. Search here for the right contact partner. Find your contact person

Customer service

Our Customer Service aims to effectively help in maintaining Liebherr equipment at its best. Customer service for crawler cranes

Used equipment

Liebherr offers a broad selection of inexpensive used construction machines, vehicles and cranes. Used equipment portal

Simulators

Highly developed simulators enable safe training under realistic conditions. LiSIM simulators

MyLiebherr

The MyLiebherr customer portal offers you an extensive range of services and additional features for your product. Open MyLiebherr customer portal

HS 8200

Discover the innovative world of Liebherr dragline excavators. Everything new. Everything better. And a true multitool

Job report

Dredging work in Piombino to remove deposited sediment from the mouth of the port. Job report port dredging

Job Report