Please choose your range
Close

NEW RAILWAY BRIDGE

Job report – the positioning system LIPOS supports Kelly drilling from a barge

900 replacement bore holes

The railway line over the Kattwyk Bridge at the Port of Hamburg received an additional, very similar, double-track lift bridge to increase the line capacity. Elaborate underwater foundation work was necessary for the two bridge foundations.

The clearing drillings on the Elbe riverbed were carried out by the drilling rig LB 36, which was equipped with the positioning system LIPOS for the first time.

Data recording as quality proof

Comprehensive data recordings were made for the respective bored piles, which included process data and positions in addition to the machine data. These were sent via radio link from the machine to the site office via server. The automated reporting functioned as proof of the quality of the drilling work carried out.

Contact us

If you have any further questions about our LIPOS, please contact our support team.

  • 0
    Wish list
    The product was added to your wish list.
  • 0 Compare list
    Select at least one other product to start the comparison. You can only compare a maximum of 7 products per list. Remove products from the list or reset the list. You can only manage a maximum of 7 different compare lists at the same time. The product was successfully added.
    Start comparison
    Your compare list is empty. You can select products to compare on the product pages.
Your wish list includes:
Recently added: Your wish list does not contain any products.
close