You are here
The LR 1250 creates light in the darkness by extending the Osram lighting plant.
To the job reportA bridge destroyed by a flood in 2010 has now been reinstated by Liebherr cranes.
To the job reportThis latest generation crawler crane features a host of innovative assistance systems.
To the job reportNear and far – the LR 1350 on the move in Swabia, but also in Australia.
To the job reportA used LR 1400/2 strengthens a crane fleet and makes an impression with its first class equipment.
To the job reportCompact, powerful and sensitive – this crawler crane caused a real stir carrying out dismantling work on Sicily.
To the job reportAn LR 1600/2 as part of the three-man defence formation did a great job at the Estadio Santiago Bernabéu in Madrid.
To the job reportOur used cranes continue to make an impression for their second owners, and are available quickly.
To the job reportNew Liebherr 700 tonne crawler crane sets new standards in the class between 600 and 750 tonnes.
To the job reportEnormous radii and moving whilst carrying 560 tonnes are no problem for the LR 1750.
To the job reportOur new LR 1800-1.0 is up and running! The first ten units of this highly flexible crawler crane, which can be modified for lots of different sectors, have already been delivered to business partners in Spain, the USA and Asia.
To the job reportThis power pack handled a relatively small load, but with a massive radius.
To the job reportTo crawler cranes were required to hoist the core section of this tunnel drilling machine.
To the job reportThe most powerful conventional crawler crane in the world saved an enormous amount of time in Tampico.
To the job report