Please choose your range
Close

Grab drilling

    
        

Drilling with bored pile grab is one of the oldest dry drilling methods and is still common today. Depending on the tools used, e.g. bored pile grab, chisel or special tools hanging on a duty cycle crawler crane, the soil is loosened either by cutting or impact driving. This method is applied, for instance, for well drilling with small drilling diameter or for the production of cast-in-place piles with sometimes very large diameters.

  • Carrier machine

  • Boom

  • Pile grab

  • Grab jaw

  • Casing oscillator

  • Casing

        
    
We need your consent This video is provided by Google*. When you load this video, your data, including your IP address, is transmitted to Google, and may be stored and processed by Google, also for its own purposes, outside the EU or the EEA and thus in a third country, in particular in the USA**. We have no influence on further data processing by Google. By clicking on “ACCEPT”, you consent to the data transmission to Google for this video pursuant to Art. 6 para. 1 point a GDPR. If you do not want to consent to each YouTube video individually in the future and want to be able to load them without this blocker, you can also select “Always accept YouTube videos” and thus also consent to the respectively associated data transmissions to Google for all other YouTube videos that you will access on our website in the future. You can withdraw given consents at any time with effect for the future and thus prevent the further transmission of your data by deselecting the respective service under “Miscellaneous services (optional)” in the settingslater also accessible via the “Privacy Settings” in the footer of our website). For further information, please refer to Data Protection Declaration and the Google Privacy Policy. * Google Ireland Limited, Gordon House, Barrow Street, Dublin 4, Ireland; parent company: Google LLC, 1600 Amphitheatre Parkway, Mountain View, CA 94043, USA
** Note: The data transfer to the USA associated with the data transmission to Google takes place on the basis of the European Commission’s adequacy decision of 10 July 2023 (EU-U.S. Data Privacy Framework).

Video drilling with hammer grab

The video shows duty cycle crawler cranes from Liebherr in drilling operation with hammer grab at various construction sites.

Machines

Hits 1-5 of 5

Get in touch

If you have any further questions, please contact our local sales or service team.

 

  • 0
    Wish list
    The product was added to your wish list.
  • 0 Compare list
    Select at least one other product to start the comparison. You can only compare a maximum of 7 products per list. Remove products from the list or reset the list. You can only manage a maximum of 7 different compare lists at the same time. The product was successfully added.
    Start comparison
    Your compare list is empty. You can select products to compare on the product pages.
Your wish list includes:
Recently added: Your wish list does not contain any products.
close