Press releases | 09/28/2022 HLC 295000: Swift and capable

  • Heavy-lift crane HLC 295000 successfully completes first offshore projects
  • Installation of XXL-monopiles possible in less than 24 hours
  • First jacket foundation and platform installations completed

With the installation of the largest monopiles ever produced in Europe and the lifting of a substation platform, the heavy lift crane HLC 295000 has successfully completed its first two offshore missions in the wind energy sector. The jobs took place at the german wind farm Arcadis Ost 1 and the french wind farm Fécamp.

Floating monopile installation at the German wind farm Arcadis Ost 1. Photo: Deme

Single image, web (147 KB)

Installation of a substation at the French wind farm Fècamp. Photo: Deme

Single image, web (168 KB)

With the offshore crane HLC 295000 and its modern technologies, the Orion is currently considered the most innovative vessel in the offshore wind industry. Now ship and crane have successfully completed its first missions.

In mid-August, the Orion first set down the 1,300-tonne jacket foundation on the prepared seabed with its HLC 295000 for the French offshore wind farm Fécamp. Then a 2,200-tonne transformer platform was successfully installed on the foundation. It was particularly important not to lose sight of the tight schedule and the weather conditions in Normandy, which was achieved not least thanks to the good dynamic positional (DP) system of the Orion and the high precision in the control of the HLC 295000.

Monopile installation in record time

Only a few weeks earlier, the offshore insatallation vessel and its Liebherr heavy lift crane crane were able to demonstrate their flexibility and performance in the wind energy sector for the first time. At the Arcadis Ost 1 wind farm in the German Baltic Sea, the HLC 295000 was used to install 28 monopile foundations. There, monopiles with lengths of up to 110 metres and a weight of up to 2,100 tonnes had to be moved and positioned for installation in the seabed. The innovation of the Orion is the ability to install the monopiles floating. This means that no time-consuming jack-up process of the ship out of the water is necessary, as it has been the case up to now with so-called jack-up units. Right from the start, it became evident how reliable and powerful the HLC 295000 is. It was often in use for 24 hours continuously.

"We are very proud of this lighthouse project and look forward to seeing the HLC 295000 in action. Our initial experience indicates that the installation times of previous vessels of about 3 to 3.5 days per monopile can be significantly reduced to about 0.9 to 1 day per monopile with the use of the Orion and our HLC", says Robert Pitschmann, Global Application Manager, Liebherr-MCCtec Rostock GmbH.

Engagement at both ends of the energy transition

With a maximum lifting capacity of up to 5,000 tonnes and a maximum lifting height of 175 metres above deck, the HLC 295000 is the largest offshore crane Liebherr has ever manufactured. The HLC series and the expansion of the heavy-duty crane range are firmly anchored in Liebherr's strategy, not least because of the energy transition. In order to ensure a sustainable energy supply for present and future generations, significantly more and larger offshore wind turbines are being built. For the construction of these modern wind turbines, the lifting height of the HLC 295000 is a decisive factor. In addition, there is a trend towards decommissioning disused offshore oil and gas platforms. This involves dismantling large and heavy parts on the open sea - an important task for Liebherr's new HLC series, which it can handle thanks to its lifting capacities. By dismantling the old and building up the new energy, the HLC series can promote the energy transition "at both ends of development" for a more sustainable future.

Downloads

Here you will find the press release and images for download.

Presseinformation Deutsch DOCX (1.2 MB)
Presseinformation Deutsch PDF (868 KB)
Press release English DOCX (1.1 MB)
Press release English PDF (620 KB)

Video

We need your consent This video is provided by Google*. When you load this video, your data, including your IP address, is transmitted to Google, and may be stored and processed by Google, also for its own purposes, outside the EU or the EEA and thus in a third country, in particular in the USA**. We have no influence on further data processing by Google. By clicking on “ACCEPT”, you consent to the data transmission to Google for this video pursuant to Art. 6 para. 1 point a GDPR. If you do not want to consent to each YouTube video individually in the future and want to be able to load them without this blocker, you can also select “Always accept YouTube videos” and thus also consent to the respectively associated data transmissions to Google for all other YouTube videos that you will access on our website in the future. You can withdraw given consents at any time with effect for the future and thus prevent the further transmission of your data by deselecting the respective service under “Miscellaneous services (optional)” in the settingslater also accessible via the “Privacy Settings” in the footer of our website). For further information, please refer to Data Protection Declaration and the Google Privacy Policy. * Google Ireland Limited, Gordon House, Barrow Street, Dublin 4, Ireland; parent company: Google LLC, 1600 Amphitheatre Parkway, Mountain View, CA 94043, USA
** Note: The data transfer to the USA associated with the data transmission to Google takes place on the basis of the European Commission’s adequacy decision of 10 July 2023 (EU-U.S. Data Privacy Framework).

Contact

Dieter Schmidt

Public Relations Manager


Liebherr-MCCtec Rostock GmbH

Liebherrstraße 1

18147 Rostock

Germany