Full displacement drilling

Full displacement drilling

Full displacement drilling

Procedure for full displacement drilling:
1. Positioning at the drilling point
2. Auger drilling until the final depth is reached
3. Extracting the auger and pumping in concrete
4. Pressing or vibrating in the reinforcement
5. Finished pile

Full displacement drilling is a modified version of continuous flight auger drilling and is exclusively used for producing cast-in-place piles. The surrounding soil is only displaced and almost no drill cuttings are conveyed to the surface. Instead of a continuous auger a smooth casing is used. At the lower end the casing is fitted with a so-called displacement body.

Examples with full displacement drilling

  • The casing is equipped with a displacement body at the lower end.

    Displacement body

    The casing is equipped with a displacement body at the lower end.

  • With full displacement drilling almost no drill cuttings are conveyed to the surface. The surrounding soil is only displaced.

    Drilling

    With full displacement drilling almost no drill cuttings are conveyed to the surface. The surrounding soil is only displaced.

  • After the casing has been drilled down it is extracted again.

    Extraction of the casing

    After the casing has been drilled down it is extracted again.

  • During extraction the concrete is pumped through the hollow stem and exits at the lower end.

    Concreting

    During extraction the concrete is pumped through the hollow stem and exits at the lower end.

  • Depending on the process the reinforcement cage can be inserted either before or directly after extraction of the casing.

    Reinforcement

    Depending on the process the reinforcement cage can be inserted either before or directly after extraction of the casing.

  • The drilling depth is increased when using a Kelly extension.

    Kelly extension

    The drilling depth is increased when using a Kelly extension.

Video full displacement drilling

The video shows, among other things, the new piling and drilling rig LRB 355, in full displacement application.

The video shows various Liebherr carrier machines working with full displacement tools. Play video

The video shows, among other things, the new piling and drilling rig LRB 355, in full displacement application.

Find your product

Which product is right for you?
Here is an overview of our machines and equipment.