LR 1160.1 unplugged Crawler crane
Max. load capacity | 160 t |
---|---|
Max. hoist height | 136 m |
Max. radius | 84 m |
Max. load capacity | 160 t |
---|---|
Max. hoist height | 136 m |
Max. radius | 84 m |
The crane causes no emissions and significantly less noise. Thus, the crane is also suitable for operation in areas sensitive to noise.
The innovative crawler crane has an electric engine.
The battery is designed to last for a 4-hour lifting work.
The crane can operate fully when connected to a conventional electric supply, or be recharged within 4.5 hours.
This includes a modern air-conditioning system with improved airflow, an optimized field of vision and increased noise protection, as well as an orthopaedic operator’s seat with integrated heating and cooling.
A global service network with experienced technicians and fast access to spare parts ensure high machine availability and a long product service life. more
When disassembled the crawler crane has a compact transport width of maximum 3 metres, which permits cost-effective transportation with standard low loaders. The connecting pieces of the luffing jib can also be transported in the connecting pieces of the main boom to save space. Fewer transport vehicles are therefore required.
moreThe Ground Pressure Visualization calculates the current ground pressure of the machine in real time and compares it with the specified safety limits of the relevant position.
moreThanks to the variety of boom configurations, the user enjoys maximum flexibility with the adaptation of the crane to the respective conditions. Rapid deployment on different construction sites is thus possible.
moreThe control system developed by Liebherr includes all operating and control functions of the crane and permits very delicate and secure lifting. The load capacities are automatically calculated during operation. The calculation of the load moment indication is also effected steplessly or without interpolation. Optimal utilisation of the machine is thus guaranteed.
moreMax. load capacity | 160 t |
---|---|
at radius | 3.90 m |
Main boom, lightweight/heavyweight from | 20 m |
Main boom, lightweight/heavyweight up to | 87 m |
Max. load torque | 959 tm |
Lattice jib from | 20.00 m |
Lattice jib up to | 83.00 m |
Central ballast | 20 t |
Counterweight at superstructure | 62 t |
Engine power | 255 kW |
Driving speed | 1.50 km/h |
Confined spatial conditions, as well as special ground conditions, are key factors for the configuration of the device. As a solution, with the "Crane Planner" Liebherr offers software for selecting the optimal crawler crane and the appropriate configuration for the respective use. more
The assistance system “Boom up-and-down Assistant” indicates the approach to the tipping border and automatically stops operation before the operator unintentionally enters an unsafe zone.
The crane is approved for personnel lifting. The statutory emergency generator and emergency controls required for personnel lifting are offered by Liebherr as a simple Plug-and-Play solution.
This control assistance system increases the comfort in the operation of the crane. Loads can be moved to their intended position more efficiently. Coordination is also simplified for multi-crane lifting.
With the radio remote control a second person outside the cab can assume all crane movements. Loads can be moved to positions which are not even visible to the operator himself. Safety on the construction site is thus increased considerably. more
The data transfer and positioning system "LiDAT" supplies important information on the operation of the machine. With this data crane operation can be made more efficient. There are various additional packages available for displaying data on wind speed or machine configuration, as well as access by service engineers via Teleservice. more