Production steps of a slurry wall panel made of reinforced concrete:
1. Excavation using a slurry wall grab with addition of support suspension
2. Installation of the stop-end pipes
3. Insertion of the reinforcement
4. Installation of the concrete applying the tremie method with simultaneous pumping out of the support fluid

If slurry walls are installed with a grab, a two-jaw slurry wall grab suspended on a duty cycle crawler crane excavates the slurry wall panels. Mechanical grabs are opened and closed via rope, hydraulic grabs via hydraulic cylinders. Hydraulic grabs can additionally be fitted with flexible guiding strips on the grab frame which allow to align the grab within the trench.

Examples with slurry wall grabs

  • A two-rope grab is mechanically actuated through the hoist and closing rope. With multiple reeving over pulleys the closing forces of the grab can be enhanced.

    Mechanical slurry wall grab

    A two-rope grab is mechanically actuated through the hoist and closing rope. With multiple reeving over pulleys the closing forces of the grab can be enhanced.

  • A hydraulically driven thrust rod system opens and closes the grab jaws. The grab is hydraulically supplied through hoses from the carrier machine.

    Hydraulic slurry wall grab

    A hydraulically driven thrust rod system opens and closes the grab jaws. The grab is hydraulically supplied through hoses from the carrier machine.

  • The most common jaw widths are between 0.4 and 1.5 metres. The jaws’ openings range from 2.8 to 3.6 metres.

    Grab dimensions

    The most common jaw widths are between 0.4 and 1.5 metres. The jaws’ openings range from 2.8 to 3.6 metres.

  • The grab jaws are exchangeable if the modification of the basic frame allows it. Thus, different trench widths are possible.

    Grab jaws

    The grab jaws are exchangeable if the modification of the basic frame allows it. Thus, different trench widths are possible.

  • In the freshly produced trench precast concrete elements, steel profiles or sealing panels can additionally be inserted. This is called combination method.

    Precast elements

    In the freshly produced trench precast concrete elements, steel profiles or sealing panels can additionally be inserted. This is called combination method.

  • After excavation of the slurry wall panel a reinforcement cage is inserted. Then the trench is filled with fresh concrete from the bottom to the top and the support fluid is pumped off.

    Concreting using the two-phase method

    After excavation of the slurry wall panel a reinforcement cage is inserted. Then the trench is filled with fresh concrete from the bottom to the top and the support fluid is pumped off.

  • The guide wall is installed on both wall sides before the excavation starts. It guides the grab, compensates variations of the suspension level and supports and protects the trench from caving in.

    Guide wall for the slurry wall grab

    The guide wall is installed on both wall sides before the excavation starts. It guides the grab, compensates variations of the suspension level and supports and protects the trench from caving in.

  • Animation video

    We need your consent This YouTube video is provided by Google. If you load the video, your data - including your IP address - is transmitted to Google and may be stored and processed by Google inter alia in the USA. We have no influence over further data processing by Google. By clicking on "Accept", you consent to the transmission of data to Google for this video in accordance with Art. 6 (1) (a) GDPR and at the same time expressly consent to the transfer of data to the USA in accordance with Art. 49 (1) (a) GDPR. If you no longer wish to consent to each YouTube video individually in the future and wish to be able to load the videos without this blocker, you can also select "Always accept YouTube" and thereby consent to the associated data transmissions and transfers to Google and to the USA for all other YouTube videos which you open on our website in the future. Please note that, in the opinion of the European Court of Justice, there does not currently exist an adequate level of data protection in line with EU standards in the USA, and at present we cannot provide suitable safeguards to protect your data and offset this shortcoming. Possible risks to you of data transfer to the USA are that access by state authorities cannot be excluded and that your data could be processed for reasons of national security, criminal prosecution or for other purposes in the public interest of the USA, possibly without you being informed separately and without enforceable rights and effective means of redress being available to you. You can withdraw consent that you have given at any time with future effect via the settings. For further information, please see our Data Protection Declaration and Google's Privacy Policy.

    Our new slurry wall grab HSG 5-18 C/L

    Video slurry wall grab

    Duty cycle crawler cranes from Liebherr excavating slurry walls with mechanical or hydraulic slurry wall grabs.
    We need your consent This YouTube video is provided by Google. If you load the video, your data - including your IP address - is transmitted to Google and may be stored and processed by Google inter alia in the USA. We have no influence over further data processing by Google. By clicking on "Accept", you consent to the transmission of data to Google for this video in accordance with Art. 6 (1) (a) GDPR and at the same time expressly consent to the transfer of data to the USA in accordance with Art. 49 (1) (a) GDPR. If you no longer wish to consent to each YouTube video individually in the future and wish to be able to load the videos without this blocker, you can also select "Always accept YouTube" and thereby consent to the associated data transmissions and transfers to Google and to the USA for all other YouTube videos which you open on our website in the future. Please note that, in the opinion of the European Court of Justice, there does not currently exist an adequate level of data protection in line with EU standards in the USA, and at present we cannot provide suitable safeguards to protect your data and offset this shortcoming. Possible risks to you of data transfer to the USA are that access by state authorities cannot be excluded and that your data could be processed for reasons of national security, criminal prosecution or for other purposes in the public interest of the USA, possibly without you being informed separately and without enforceable rights and effective means of redress being available to you. You can withdraw consent that you have given at any time with future effect via the settings. For further information, please see our Data Protection Declaration and Google's Privacy Policy.
    Duty cycle crawler cranes from Liebherr excavating slurry walls with mechanical or hydraulic slurry wall grabs. Play video
    Duty cycle crawler cranes from Liebherr excavating slurry walls with mechanical or hydraulic slurry wall grabs.
    We need your consent This YouTube video is provided by Google. If you load the video, your data - including your IP address - is transmitted to Google and may be stored and processed by Google inter alia in the USA. We have no influence over further data processing by Google. By clicking on "Accept", you consent to the transmission of data to Google for this video in accordance with Art. 6 (1) (a) GDPR and at the same time expressly consent to the transfer of data to the USA in accordance with Art. 49 (1) (a) GDPR. If you no longer wish to consent to each YouTube video individually in the future and wish to be able to load the videos without this blocker, you can also select "Always accept YouTube" and thereby consent to the associated data transmissions and transfers to Google and to the USA for all other YouTube videos which you open on our website in the future. Please note that, in the opinion of the European Court of Justice, there does not currently exist an adequate level of data protection in line with EU standards in the USA, and at present we cannot provide suitable safeguards to protect your data and offset this shortcoming. Possible risks to you of data transfer to the USA are that access by state authorities cannot be excluded and that your data could be processed for reasons of national security, criminal prosecution or for other purposes in the public interest of the USA, possibly without you being informed separately and without enforceable rights and effective means of redress being available to you. You can withdraw consent that you have given at any time with future effect via the settings. For further information, please see our Data Protection Declaration and Google's Privacy Policy.

    Job reports

    Find your product

    Which product is right for you?
    Here is an overview of our machines and equipment.