Press releases | 02/10/2023 RL 2600 crane shipped for DolWin epsilon platform

  • RL 2600-35 Litronic offshore crane has been successfully shipped for the DolWin5 project by Aibel, TenneT
  • The crane is scheduled to be installed in March 2023 and the DolWin5 platform is expected to be operational in 2024
  • The first RL 2600 crane for TenneT to be equipped with the Master V control system

Liebherr-MCCtec Rostock GmbH successfully shipped an RL 2600 offshore crane for the converter platform DolWin epsilon to Singapore on the vessel UHL Felicity. TenneT has assigned Aibel AS to construct the DolWin epsilon offshore converter platform in the German North Sea, where the Liebherr crane will be utilized for supplying and maintaining the platform.

An RL 2600-35 Litronic offshore crane has been successfully shipped for the DolWin5 project by Aibel & TenneT.

Single image, web (145 KB)

Rostock (Germany) – The Liebherr crane was shipped to Singapore on 27 December 2022 and installation on the DolWin epsilon platform is planned for March. The DolWin5 platform is scheduled to enter service in 2024. The RL 2600-35 Litronic is a weight-optimised and compact designed offshore crane. The cylinder-luffing crane is the ideal equipment for small platforms, where space is limited. The RL 2600 has a box boom with a maximum working radius of 52 metres and a maximum lifting capacity of up to 35 tonnes.

“With the delivery of the RL 2600, we conclude a successful cooperation with Aibel and TenneT and enable highly efficient and reliable operation of the offshore converter platforms, which is particularly important in times of the energy transition,” comments Matti Basan, Senior Sales Manager for Liebherr Offshore Cranes. “We are confident about the future and expect more projects to be launched in the offshore wind sector. Our goal is to continue to play a leading role in the development and supply of crane solutions for the offshore industry,” Basan adds.

The RL 2600 is the first crane for TenneT to be equipped with a Master V control system, which was developed for the latest maintenance systems such as LiMain. Despite difficult circumstances during the production period, in the middle of the COVID phase, the crane was delivered on time.

“We are very happy to have an experienced and reliable partner on board with Liebherr. As with previous projects, Liebherr has been very cooperative and the RL-cranes are at the top level in their segment, both technically and in terms of quality,” states Martin Lundgren, Aibel AS Project Procurement Manager DolWin5.

The DolWin5 project – 900 MW from three wind parks

The associated offshore platform DolWin epsilon converts the three-phase current produced by wind turbines into direct current. From there, a 100 km long submarine cable runs in a southerly direction past the island of Borkum in the west to the landing point in East Frisia. On land, the electricity is transported 30 km further to the onshore converter station and converted back into three-phase current, ultimately being fed into the extra-high voltage grid via the transformer station. Due to the distance and the power to be transmitted, direct current is suitable for low-loss transport.

Downloads

Here you will find the press release and images for download.

Presseinformation Deutsch DOCX (1.6 MB)
Presseinformation Deutsch PDF (154 KB)
Press release English DOCX (1.6 MB)
Press release English PDF (149 KB)

Video

We need your consent This video is provided by Google*. When you load this video, your data, including your IP address, is transmitted to Google, and may be stored and processed by Google, also for its own purposes, outside the EU or the EEA and thus in a third country, in particular in the USA**. We have no influence on further data processing by Google. By clicking on “ACCEPT”, you consent to the data transmission to Google for this video pursuant to Art. 6 para. 1 point a GDPR. If you do not want to consent to each YouTube video individually in the future and want to be able to load them without this blocker, you can also select “Always accept YouTube videos” and thus also consent to the respectively associated data transmissions to Google for all other YouTube videos that you will access on our website in the future. You can withdraw given consents at any time with effect for the future and thus prevent the further transmission of your data by deselecting the respective service under “Miscellaneous services (optional)” in the settings later also accessible via the “Privacy Settings” in the footer of our website). For further information, please refer to Data Protection Declaration and the Google Privacy Policy. * Google Ireland Limited, Gordon House, Barrow Street, Dublin 4, Ireland; parent company: Google LLC, 1600 Amphitheatre Parkway, Mountain View, CA 94043, USA
** Note: The data transfer to the USA associated with the data transmission to Google takes place on the basis of the European Commission’s adequacy decision of 10 July 2023 (EU-U.S. Data Privacy Framework).

Contact

Philipp  Helberg


Liebherr-MCCtec Rostock GmbH

Liebherrstraße 1

18147 Rostock

Germany