Press releases | 02/07/2020 A Liebherr Mobilmix 3.5 produces the concrete for the largest lock in the world

  • Up to 150 m³ output capacity per hour
  • Optimum construction site mixing plant due to mobile construction
  • Favourable transport thanks to container design with sea container approval

A highly mobile concrete mixing plant proves its capabilities at the lock construction site in the Netherlands.

The Mobilmix 3.5 from Liebherr reliably supplies the lock construction site with concrete.

Single image, web (223 KB)

Dyckerhoff Basal is the Dutch subsidiary of the cement manufacturer Dyckerhoff GmbH, which in turn belongs to the Italian Buzzi Unicem Group and currently employs 11,000 people in more than eleven countries worldwide. Dyckerhoff Basal is one of the largest suppliers of ready-mix concrete and cement in the Netherlands.

In order to make Amsterdam, one of the most important European ports, accessible for the new generations of ships with even larger dimensions, the largest lock in the world will be built in IJmuiden. IJmuiden is located at the outh of the 27-kilometerlong North Sea Canal, which connects Amsterdam with the sea.

The construction project comprises an investment volume of approx. 700 million euros and is to be completed within a construction period of approx. seven years. The new lock is to be opened for shipping at the beginning of 2022. The largest lock in the world requires around 300,000 m³ of concrete.

For Dyckerhoff Basal, the most important criterion in selecting the concrete mixing plant was a rapid start of operation and the possibility of a rapid change of location in the future in order to be able to start concrete production at short notice for construction projects with limited time. In addition, a theoretical output capacity of up to 150 m³/h was an essential requirement for the mixing plant in order to reliably cover delivery peaks throughout the day.

Liebherr and Dyckerhoff Basal have selected the Mobilmix 3.5-C in container design with CSC approval for cost-effective and worldwide ship transport as the optimum solution under the given conditions. Thanks to its container design and installation on steel foundations, the Mobilmix 3.5-C is ideally suited for quick installation and relocation in temporary construction projects.

The plant can be relocated within four days. Thanks to the already integrated insulation, the Mobilmix 3.5-C is also optimally equipped for winter operation. The Mobilmix 3.5-C is equipped with a robust and reliable Liebherr DW 3.5 twin-shaft mixer. The DW 3.5 enables optimum concrete homogeneity thanks to the three-dimensional mixing principle. In addition, the Liebherr twinshaftmixer is particularly suitable for short-term recipe changes.

With the Mobilmix 3.5-C, up to 150 m³ of concrete can be produced per hour, as a double plant even up to 300 m³. The plant is operated intuitively via Liebherr‘s own Litronic-MPS control system at a PC workstation. All components are optimally accessible for maintenance work thanks to the generous steps and platforms and offer sufficient space for tools and working equipment.

Downloads

Here you will find the press release and images for download.

Presseinformation Deutsch PDF (219 KB)
Press Information English PDF (23 KB)
Information Presse Français PDF (25 KB)

Contact

Klaus Eckert

Head of Marketing


Liebherr-Mischtechnik GmbH

Im Elchgrund 12

88427 Bad Schussenried

Germany