The LTM 11200-9.1 from Liebherr features a load capacity of 1,200 tonnes and a 100-metre telescopic boom. The fact that the heavy duty mobile crane is profitable is confirmed by the number of units delivered, with over 50 being sold since its market launch in 2007. The Max Bögl Group recently took delivery of its third LTM 11200-9.1.
The Max Bögl Group received its first LTM 11200-9.1 in April 2013. The group received its second crane of this type in May 2014. Now in November the third LTM 11200-9.1 for Max Bögl was handed over at the Liebherr plant in Ehingen. The company's purchase of the three machines in a short space of time confirms that the concept of Liebherr's heavy duty crane is absolutely right. To date the LTM 11200-9.1 is the most powerful telescopic mobile crane on the market. At the same time its telescopic boom is one of the longest in the world at 100 metres. With lattice extensions and a luffing jib the LTM 11200-9.1 can reach hoisting heights of up to 188 metres.
The nine-axle machine with its variable boom system is suitable for universal use for industry, infrastructure and power generation jobs. "We particularly use our LTM 11200 9.1 in the wind power industry. They are perfect for erecting hybrid towers", says Peter Guttenberger, Director of Transport and Machines at Max Bögl.

19/10/2026
Press releases
Liebherr LR 11350 erects the world’s tallest wind turbine
At the end of September, what is now the world’s tallest wind turbine was completed. A Liebherr LR 11350 crawler crane from Schmidbauer GmbH & Co. KG was used in the construction of the prototype of the so-called GICON high-altitude wind turbine in Lusatia, Brandenburg.

16/10/2026
Press releases
A historic suspension railway carriage is once again gliding through Wuppertal: using a Liebherr LTM 1450-8.1 mobile crane, Franz Bracht Kran-Vermietung GmbH lifted carriage 76, weighing around seven tonnes, into Wuppertal Central Station. Given the limited space available, precise operational planning and modern mobile crane technology were crucial.

13/10/2026
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.