
Press releases | 2018/05/18
Vestas opens an assembly line for wind turbine nacelles on Liebherr site in Russia
On the Liebherr site in Nizhny Novgorod (Russia), Vestas opens a nacelle assembly line for 3.6 MW wind turbines. Thereby, Liebherr provides Vestas with a production hall and services.


