Tower cranes

Press releases | 2025/07/29

Liebherr fibre cranes support the construction of a new tramway bridge in Brest

  • Liebherr 520 EC-B 20 Fibre crane is playing a key role on a bridge construction project in Brest, France
  • Saint-Yves Services currently operates two of the powerful 520 EC-B Liebherr fibre cranes in France
  • The newest fibre rope technology delivers greater lifting capacity, lower weight, and easier handling

A Liebherr 520 EC-B 20 Fibre crane is currently supporting the construction of the new Schuman Bridge in Brest, France. Equipped with the advanced fibre rope technology, the crane impresses with its high load capacity, efficiency, and ease of use. Liebherr customer Saint-Yves Services confirms the benefits of the fibre rope in the demanding bridge construction and sets an example for forward-thinking solutions in infrastructure construction.

The Liebherr 520 EC-B 20 Fibre flat-top crane is playing a key role in the precise assembly of massive steel components during the construction of the new Schuman Bridge in Brest, France. As the most powerful fibre crane currently in operation on the French market, it is demonstrating its performance capabilities on one of the region’s most important infrastructure sites.

A new bridge to improve urban mobility

The new Schuman Bridge is being built parallel to the existing structure from the 1950s, which no longer meets the requirements of modern public transport. It will form part of the extension of Brest’s tram line B and will also provide a crossing for cyclists and pedestrians. The bridge spans 204 metres in length and measures 12.25 metres in width. The use of large steel elements requires a crane with both high lifting capacity and exceptional precision.

The 520 EC-B 20 Fibre stands out for its robust design, flexible tower configurations, and ease of transport. With its modular setup, innovative Litronic control system, and precise load positioning capabilities, the crane is ideally suited for large-scale projects such as the Schuman Bridge. The bridge is scheduled for completion by the end of 2025 and is expected to make a significant contribution to the urban mobility in the region.

Strong performance with fibre technology

The crane in use comes from the fleet of Liebherr customer Saint-Yves Services. The company has expressed a high level of satisfaction with the crane’s performance. Emphasis is placed on the numerous advantages of fibre rope technology compared to traditional steel ropes. "The combination of power, efficiency, and the straightforward handling of the fibre rope gives us, a considerable competitive edge," says Alexandre Saint-Yves. The 520 EC-B 20 Fibre combines these advantages with long reach and a high load capacity, even in confined spaces. With a fleet of eleven Liebherr fibre cranes, Saint-Yves Services is demonstrating its innovative strength and sees fibre technology as a sustainable and economically efficient solution for future construction projects.

Contacts

Shannon Korff, Marketing Specialist

Shannon Korff

Marketing Specialist

Liebherr-Werk Biberach GmbH