News | 03/01/2021
A new heating, ventilation and air conditioning system (HVAC system), which was developed and manufactured by Liebherr-Transportation Systems on behalf of Siemens Mobility for the so-called “X cars”, has successfully completed numerous tests in the Rail TeC Arsenal (RTA), the Climatic Wind Tunnel in Vienna (Austria).
The Liebherr HVAC system was tested in a test vehicle under extreme climatic conditions. For example, outside temperatures ranging from -25 °C to +45 °C and strong winds were simulated. In addition, the tests served to optimize the settings of the air distribution system in order to create the best possible comfort conditions for passengers.
The tests in the RTA are part of the approval process for the new generation of metro trains that Siemens deliver to Wiener Linien. They complement the temperature and function tests that Liebherr-Transportation Systems carried out in advance in its own test facilities in Korneuburg (Austria).
You might also be interested in

11/05/2026
Press releases
Liebherr-Aerospace strengthens its presence in Australasia
Liebherr-Aerospace is expanding its footprint in Australasia with a new representative office in Sydney, strengthening already existing as well as establishing new local relationships and intensifying customer services across Australia and New Zealand. Based within the Liebherr Group’s existing Pyrmont facility, the office reinforces the company’s commitment to the region, where the aviation industry is currently undergoing a significant period of fleet renewal and investment.

11/05/2026
News
Sustainability Days foster exchange at Liebherr-Aerospace & Transportation SAS
At Liebherr-Aerospace & Transportation SAS in Toulouse, colleagues spent two days exchanging on corporate responsibility, supply chain integration, reporting requirements, and related operational challenges.

10/28/2026
Press releases
Liebherr to overhaul KLM Cityhopper’s Embraer 175-E1 landing gears
Liebherr-Aerospace and KLM Cityhopper have signed an agreement covering the overhaul of the main and nose landing gear systems on the airline’s Embraer 175-E1 aircraft fleet. The campaign is scheduled to begin in November 2027.

