News | 06/01/2016
On June 1, 2016, Dr. h.c. Willi Liebherr and the Managing Directors from Liebherr-Aerospace Lindenberg GmbH, Josef Gropper, Heiko Lütjens and Arndt Schoenemann welcomed a special guest at the stand of Liebherr-Aerospace: Sigmar Gabriel, the German Federal Minister for Economy and Energy, who was visiting this year’s Berlin airshow.
From the various exhibits at the stand, the politician was particularly impressed by components that were produced by 3D printing. On show are, for instance, a spoiler valve block and a highly integrated actuator, alongside their conventionally produced, in other words milled and turned versions for comparison. Liebherr-Aerospace considers itself to be a pioneer in 3D printing. Therefore, Dr. h.c. Willi Liebherr took the opportunity to personally explain the advantages of this promising production process to Sigmar Gabriel. Welded layer by layer, they are considerably lighter and more compact, and the development lead times are much shorter.
You might also be interested in

11/05/2026
Press releases
Liebherr-Aerospace strengthens its presence in Australasia
Liebherr-Aerospace is expanding its footprint in Australasia with a new representative office in Sydney, strengthening already existing as well as establishing new local relationships and intensifying customer services across Australia and New Zealand. Based within the Liebherr Group’s existing Pyrmont facility, the office reinforces the company’s commitment to the region, where the aviation industry is currently undergoing a significant period of fleet renewal and investment.

11/05/2026
News
Sustainability Days foster exchange at Liebherr-Aerospace & Transportation SAS
At Liebherr-Aerospace & Transportation SAS in Toulouse, colleagues spent two days exchanging on corporate responsibility, supply chain integration, reporting requirements, and related operational challenges.

10/28/2026
Press releases
Liebherr to overhaul KLM Cityhopper’s Embraer 175-E1 landing gears
Liebherr-Aerospace and KLM Cityhopper have signed an agreement covering the overhaul of the main and nose landing gear systems on the airline’s Embraer 175-E1 aircraft fleet. The campaign is scheduled to begin in November 2027.

