News | 06/11/2014
Liebherr-Transportation Systems has recently opened a maintenance workshop in London (UK). The new station is in charge of servicing Liebherr HVAC systems that are on board the trains of various rail lines in Greater London, such as Stansted Express, Southern Railways oder Thameslink.
The station, which is 900 m² in area, houses not only a repair workshop, but also an inventory for spare parts. A team of field service technicians ensures that the systems function flawlessly throughout the operating hours of the trains, thus allowing for optimized reliability and operation costs. The new maintenance workshop complements Liebherr’s existing facility based in Sunderland, which coordinates Liebherr-Transportations Systems’ activities in the UK. Since the workshop is located in close proximity to rail operators in London, the company will achieve reduced transport and turn-around times for repair and overhaul activities and enhance its customer service for HVAC systems.
You might also be interested in

11/05/2026
Press releases
Liebherr-Aerospace strengthens its presence in Australasia
Liebherr-Aerospace is expanding its footprint in Australasia with a new representative office in Sydney, strengthening already existing as well as establishing new local relationships and intensifying customer services across Australia and New Zealand. Based within the Liebherr Group’s existing Pyrmont facility, the office reinforces the company’s commitment to the region, where the aviation industry is currently undergoing a significant period of fleet renewal and investment.

11/05/2026
News
Sustainability Days foster exchange at Liebherr-Aerospace & Transportation SAS
At Liebherr-Aerospace & Transportation SAS in Toulouse, colleagues spent two days exchanging on corporate responsibility, supply chain integration, reporting requirements, and related operational challenges.

10/28/2026
Press releases
Liebherr to overhaul KLM Cityhopper’s Embraer 175-E1 landing gears
Liebherr-Aerospace and KLM Cityhopper have signed an agreement covering the overhaul of the main and nose landing gear systems on the airline’s Embraer 175-E1 aircraft fleet. The campaign is scheduled to begin in November 2027.

