News | 10/26/2015
Liebherr-Transportation Systems carries out a project commissioned by the German Federal Environment Agency (Umweltbundesamt, Dessau-Roßlau) under the framework of the environment research program of the German Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety. Subject of the investigation is testing, measuring and evaluation of air conditioning systems using natural refrigerants for a sustainable heating and cooling of public transport.
All measurements and analyses are carried out on a test train (ICE 3 model 403, 1st series) which is provided by Deutsche Bahn (German National railway operator) using state-of-the-art technologies.
The project aims to determine the energy consumption of the system over the entire life cycle under real operating conditions over all seasons. On that basis conclusions can be drawn on the competitiveness of air conditioning systems with the natural refrigerant air compared to conventional systems.
You might also be interested in

11/05/2026
Press releases
Liebherr-Aerospace strengthens its presence in Australasia
Liebherr-Aerospace is expanding its footprint in Australasia with a new representative office in Sydney, strengthening already existing as well as establishing new local relationships and intensifying customer services across Australia and New Zealand. Based within the Liebherr Group’s existing Pyrmont facility, the office reinforces the company’s commitment to the region, where the aviation industry is currently undergoing a significant period of fleet renewal and investment.

11/05/2026
News
Sustainability Days foster exchange at Liebherr-Aerospace & Transportation SAS
At Liebherr-Aerospace & Transportation SAS in Toulouse, colleagues spent two days exchanging on corporate responsibility, supply chain integration, reporting requirements, and related operational challenges.

10/28/2026
Press releases
Liebherr to overhaul KLM Cityhopper’s Embraer 175-E1 landing gears
Liebherr-Aerospace and KLM Cityhopper have signed an agreement covering the overhaul of the main and nose landing gear systems on the airline’s Embraer 175-E1 aircraft fleet. The campaign is scheduled to begin in November 2027.

