On September 12, 2019, Embraer delivered its first E195-E2 to its launch operator, Azul Linhas Aéreas in Brazil.
The jet features key technology made by Liebherr: Liebherr-Aerospace has developed and supplies the advanced full fly-by-wire high-lift system with integrated computers, the integrated air management system with lightweight electro-pneumatic and mechanical components, as well as the nose wheel steering control module for the E-Jets E2 aircraft.
Liebherr-Aerospace offers support solutions for its components and systems on board the E195-E2 during the aircraft’s entire life cycle. Thanks to its international network of maintenance, repair and overhaul stations and spares distribution facilities, the company’s customer service organization ensures customer proximity and high-level performance for aircraft operators across the world.
You might also be interested in

11/05/2026
Press releases
Liebherr-Aerospace strengthens its presence in Australasia
Liebherr-Aerospace is expanding its footprint in Australasia with a new representative office in Sydney, strengthening already existing as well as establishing new local relationships and intensifying customer services across Australia and New Zealand. Based within the Liebherr Group’s existing Pyrmont facility, the office reinforces the company’s commitment to the region, where the aviation industry is currently undergoing a significant period of fleet renewal and investment.

11/05/2026
News
Sustainability Days foster exchange at Liebherr-Aerospace & Transportation SAS
At Liebherr-Aerospace & Transportation SAS in Toulouse, colleagues spent two days exchanging on corporate responsibility, supply chain integration, reporting requirements, and related operational challenges.

10/28/2026
Press releases
Liebherr to overhaul KLM Cityhopper’s Embraer 175-E1 landing gears
Liebherr-Aerospace and KLM Cityhopper have signed an agreement covering the overhaul of the main and nose landing gear systems on the airline’s Embraer 175-E1 aircraft fleet. The campaign is scheduled to begin in November 2027.

