In the summer of 2011, the production facility of Liebherr-Aerospace was officially opened in Dzerzhinsk, near Nizhny Novogord (Russia). Today, more than 80 high-qualified employees are responsible for cutting-edge high precision CNC-manufacturing of aircraft equipment components made of steel. The production processes include high velocity oxygen fuel spraying and non-destructive testing methods. Since its beginnings, Liebherr-Aerospace Nizhny Novgorod OOO has been developed continuously into a production facility which maintains a certified quality management system according to EN ISO 9001.
The manufactured parts are supplied to Liebherr-Aerospace Lindenberg GmbH, Lindenberg (Germany) for the integration in flight control systems and Liebherr-Aerospace Toulouse SAS, Toulouse (France) for air management systems.
In the near future, Liebherr-Aerospace Nizhny Novgorod OOO will expand its production capabilities for components of landing gear systems.
You might also be interested in

11/05/2026
Press releases
Liebherr-Aerospace strengthens its presence in Australasia
Liebherr-Aerospace is expanding its footprint in Australasia with a new representative office in Sydney, strengthening already existing as well as establishing new local relationships and intensifying customer services across Australia and New Zealand. Based within the Liebherr Group’s existing Pyrmont facility, the office reinforces the company’s commitment to the region, where the aviation industry is currently undergoing a significant period of fleet renewal and investment.

11/05/2026
News
Sustainability Days foster exchange at Liebherr-Aerospace & Transportation SAS
At Liebherr-Aerospace & Transportation SAS in Toulouse, colleagues spent two days exchanging on corporate responsibility, supply chain integration, reporting requirements, and related operational challenges.

10/28/2026
Press releases
Liebherr to overhaul KLM Cityhopper’s Embraer 175-E1 landing gears
Liebherr-Aerospace and KLM Cityhopper have signed an agreement covering the overhaul of the main and nose landing gear systems on the airline’s Embraer 175-E1 aircraft fleet. The campaign is scheduled to begin in November 2027.

