
Press releases | 08/14/2020
Industrial tent structure moved on crane hooks
- Prangl relocated a large tent structure using three Liebherr mobile cranes – LTM 1200-5.1, LTM 1160-5.2 and LTM 1090-4.2
- VarioBase® and VarioBallast® enable cranes to work in narrow alley
- Crane job eliminated the need for one month of dismantling and erection work for the industrial tent structure
Tyrol, a popular destination for mountain and other hikers, was recently the scene of a very special trip – an industrial tent structure weighing over 40 tonnes and spanning an area of around 1,400 square metres “walked” around 100 metres in just a few hours. A large assembly hall was moved to its new location in several stages on the hook blocks of three LTM mobile cranes.


