5 questions that reveal why electrifying off-highway machinery is harder than you think

Daniel Bachmann, Managing Director Liebherr Energy Solutions GmbH

What's the question the industry should actually be asking when it comes to electrification?

The job site as an energy system: the Liduro Power Port decouples energy demand from grid capacity – making electrification viable where the grid alone isn't enough.

So what does a job site actually need to make electrification work?

The machine is only part of the answer. This construction site in the Austrian Alps runs on an integrated energy system — proof that the real solution lies in the ecosystem around the machine.

Why is off-highway such a different challenge compared to, say, electric cars?

The right drive for the right application: the L 507 E shows where battery-electric already delivers today.

Is battery-electric always the right answer?

From machine to ecosystem: the Liduro Power Port, paired with Liebherr's Energy Planner software, brings holistic energy management to the job site.

What role does software play in all of this?

Contacts

Katharina Bader
Katharina Bader
Liebherr-International AG General-Guisanstrasse 6 5415 Nussbaumen Switzerland

  • Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung

    09/10/2026

    Press releases

    Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung

    A new residential development is under construction in Ho Chung, Sai Kung. Foundation and excavation and lateral support works have been underway since December 2024 and are expected to continue until end of 2026. Two Liebherr NC-B 12-70 tower cranes are handling material logistics on the confined site.

  • Darma Henwa expands fleet with 10 new Liebherr machines

    09/09/2026

    Press releases

    Darma Henwa expands fleet with 10 new Liebherr machines

    In less than a year, Liebherr Indonesia has delivered a fleet of 10 machines to Darma Henwa – four R 9200 excavators and six PR 776 dozers, half of which are the Generation 8 model. These machines are currently working across the Bengalon and Kintap mines in Kalimantan.

  • For the construction sites of tomorrow: Hiap Heng enters the mobile construction crane market

    09/08/2026

    Press releases

    For the construction sites of tomorrow: Hiap Heng enters the mobile construction crane market

    On 2. August, the Hiap Heng Group took delivery of its first Liebherr mobile construction crane. With the MK 88-4.1E, the company is expanding its fleet with an efficient lifting solution for construction sites with limited space. The crane combines versatility with high performance and enables fast, low-emission operations on urban construction projects.