5 questions that reveal why electrifying off-highway machinery is harder than you think

Daniel Bachmann, Managing Director Liebherr Energy Solutions GmbH

What's the question the industry should actually be asking when it comes to electrification?

The job site as an energy system: the Liduro Power Port decouples energy demand from grid capacity – making electrification viable where the grid alone isn't enough.

So what does a job site actually need to make electrification work?

The machine is only part of the answer. This construction site in the Austrian Alps runs on an integrated energy system — proof that the real solution lies in the ecosystem around the machine.

Why is off-highway such a different challenge compared to, say, electric cars?

The right drive for the right application: the L 507 E shows where battery-electric already delivers today.

Is battery-electric always the right answer?

From machine to ecosystem: the Liduro Power Port, paired with Liebherr's Energy Planner software, brings holistic energy management to the job site.

What role does software play in all of this?

Contacts

Katharina Bader
Katharina Bader
Liebherr-International AG General-Guisanstrasse 6 5415 Nussbaumen Switzerland

You might also be interested in

  • When technology makes art possible: Liebherr MK 88-4.1 mobile construction crane supports an extraordinary art project on the Pont-Neuf

    25/09/2026

    Press releases

    When technology makes art possible: Liebherr MK 88-4.1 mobile construction crane supports an extraordinary art project on the Pont-Neuf

    Against the impressive backdrop of Paris city centre, a Liebherr MK 88-4.1 mobile construction crane from the Ponticelli group of companies mastered an extraordinary task.

  • Enercon expands crane fleet with Liebherr LR 11000 crawler crane

    24/09/2026

    Press releases

    Enercon expands crane fleet with Liebherr LR 11000 crawler crane

    Wind turbine manufacturer Enercon has expanded its crane fleet with a Liebherr LR 11000 crawler crane. With a maximum lifting capacity of 1,000 tonnes, the large crawler crane is among the most powerful models in its class for the onshore wind market. In the future, Enercon will primarily use the LR 11000 for the installation of its latest generation of wind turbines.

  • LRB 19 from Liebherr installs sheet pile walls for short project

    24/09/2026

    Press releases

    LRB 19 from Liebherr installs sheet pile walls for short project

    Quickly deployed, quickly adapted, quickly transported: These features convinced Heisig Spezialtief- und Wasserbau GmbH on the merits of the LRB 19. The piling and drilling rig really comes into its own, particularly on jobsites where the projects are of short duration. In Clenze, Lower Saxony (Germany), the company fitted the LRB 19 with the LV 23 vibrator to drive sheet piles – a solution which, thanks to their perfect harmonisation, enables maximum efficiency.