Franz Bracht Kranvermietung GmbH has taken delivery of three new Liebherr LTM 1160-5.2 mobile cranes within 6 months. Owner Dirk Bracht highlights the high lifting capacities of the 5-axle crane and its variable supporting base as major purchase criteria.
The three new LTM 1160-5.2 cranes will expand the Bracht Group's fleet and are stationed at Erwitte, Duisburg and Paderborn. Bracht uses many cranes in the class between 130 tonnes and 160 tonnes in wind farms. Over the last few months demand has risen in this industry and additional cranes were needed in the Bracht fleet to meet this demand. This led to the decision to purchase three new 160-tonne machines. The Liebherr LTM 1160-5.2 cranes will mainly be used for routine jobs. Dirk Bracht explains: "A crane with maximum flexibility is always important for routine work. The VarioBase® variable supporting base from Liebherr delivers this flexibility to a tee. It also significantly enhances safety levels."
One of the first crane jobs for the third LTM 1160-5.2 was unloading a new timber saw in Warstein-Hirschberg (Sauerland). The 8-tonne saw had to be unloaded with a radius of 31 meter. To do this job the crane was ballasted with 34 tonnes and the boom was extended to 40 meter.

2026-10-13
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.

2026-10-08
Press releases
THW builds Danube bridge using four Liebherr LTC 1050-3.1 cranes
In Tuttlingen, southern Germany, four small Liebherr cranes have achieved great things: as a temporary replacement for a Danube bridge due for demolition, the LTC 1050-3.1 compact cranes erected a 70-metre-long river crossing as part of a civil defence exercise.

2026-10-07
Press releases
Replacing the European Parliament’s air-conditioning system in Luxembourg required a long reach, precise planning and meticulously coordinated logistics. A Liebherr LTM 1650-8.1 mobile crane from STEIL Kranarbeiten in Trier lifted six old components from the roof and installed the new units.