News | 2022-10-30
News | 2022-10-30
Michels Construction, Inc. is a diversified global leader in energy and infrastructure in the US. At Bauma 2022, the company purchased four Liebherr LB 35 drilling rigs and one LB 30 drilling rig. As the machines were taken over directly from the rental fleet of Liebherr in the US, the drilling rigs are already in use at the customer's premises: They are working in different applications such as Kelly drilling and continuous flight auger drilling (CFA) on projects in Chicago and Tennessee, USA.
As a leading US foundation company, Michels Construction has owned most competitive construction equipment brands. The superior performance attributes of the Liebherr deep foundation machines as well as their high quality manufacture backed by industry leading product support changed that. The result is their decision to continue to invest in Liebherr deep foundation machines and duty cycle crawler cranes.
Additionally, as a family owned business, Michels Construction appreciates the value of a direct relationship with Liebherr. Michels perceives the fact that Liebherr is an independent, family-run company as an advantage that ensures a long-term and advantageous supplier partnership.

2026-10-13
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.

2026-10-08
Press releases
THW builds Danube bridge using four Liebherr LTC 1050-3.1 cranes
In Tuttlingen, southern Germany, four small Liebherr cranes have achieved great things: as a temporary replacement for a Danube bridge due for demolition, the LTC 1050-3.1 compact cranes erected a 70-metre-long river crossing as part of a civil defence exercise.

2026-10-07
Press releases
Replacing the European Parliament’s air-conditioning system in Luxembourg required a long reach, precise planning and meticulously coordinated logistics. A Liebherr LTM 1650-8.1 mobile crane from STEIL Kranarbeiten in Trier lifted six old components from the roof and installed the new units.