
Press releases | 2019-06-06
First Liebherr MK 88 mobile construction crane reaches Spain
The Spanish crane company Grúas Serrat SA has taken delivery of a Liebherr mobile construction crane – the first MK 88 Plus in Spain.
Press releases | 2019-06-06
The Spanish crane company Grúas Serrat SA has taken delivery of a Liebherr mobile construction crane – the first MK 88 Plus in Spain.
The handover of the mobile construction crane took place at Grúas Serrat SA’s depot in Barberà del Vallès – a Catalan city in the province of Barcelona in north-eastern Spain. “It’s a fantastic machine,” praises Josep Vega, the crane company’s owner. He sees it as the perfect complement to his 80-strong fleet of cranes of different lifting solutions, and especially for inner-city operations: For one thing, it requires very little space, can be positioned directly at the building and still has an enormous reach. As well as this, thanks to its electric drives, it is extremely quiet in operation – a particular advantage at night.
The Spanish crane company Grúas Serrat SA was founded in 1967 and has since made a name for itself in the areas of civil and structural engineering projects. The 60-employee strong company has a fleet that predominantly includes truck loading and mobile cranes and now wants the MK 88 Plus to fill the gap.


2026-10-13
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.

2026-10-08
Press releases
THW builds Danube bridge using four Liebherr LTC 1050-3.1 cranes
In Tuttlingen, southern Germany, four small Liebherr cranes have achieved great things: as a temporary replacement for a Danube bridge due for demolition, the LTC 1050-3.1 compact cranes erected a 70-metre-long river crossing as part of a civil defence exercise.

2026-10-07
Press releases
Replacing the European Parliament’s air-conditioning system in Luxembourg required a long reach, precise planning and meticulously coordinated logistics. A Liebherr LTM 1650-8.1 mobile crane from STEIL Kranarbeiten in Trier lifted six old components from the roof and installed the new units.