One of Liebherr-Australia’s South Australian customers, Max Cranes have taken ownership of the largest All-Terrain Mobile Crane manufactured by Liebherr-Werk Ehingen GmbH (LWE), and boasts the biggest of its kind in the Southern Hemisphere.
MAX and its heavy lift team will be operating in servicing and maintaining the fast erecting wind farm parks and utilising the machine for general heavy lifting on major projects around the country.
Their decision towards the LTM 11200-9.1 was its flexibility, long reach and great capacity of maximum 1,200t, which allows MAX to expand its capabilities in construction and the maintenance of wind towers nationally.
After weeks of intensive training with two specialised trainers from Liebherr’s Mobile and Crawler Crane factory, MAX Cranes took delivery of the machine prior to their open day launch in Port Augusta in late November. With over 300 people in attendance, MAX’s commitment and enthusiasm about heavy lifting on this machine was inspirational. The day after the launch, they opened their doors to school children and the public to experience this remarkable piece of machinery.
Liebherr is proud and excited to support MAX on their way to success with their new LTM 11200-9.1.

2026-10-13
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.

2026-10-08
Press releases
THW builds Danube bridge using four Liebherr LTC 1050-3.1 cranes
In Tuttlingen, southern Germany, four small Liebherr cranes have achieved great things: as a temporary replacement for a Danube bridge due for demolition, the LTC 1050-3.1 compact cranes erected a 70-metre-long river crossing as part of a civil defence exercise.

2026-10-07
Press releases
Replacing the European Parliament’s air-conditioning system in Luxembourg required a long reach, precise planning and meticulously coordinated logistics. A Liebherr LTM 1650-8.1 mobile crane from STEIL Kranarbeiten in Trier lifted six old components from the roof and installed the new units.